| 分部工程名称 | A | B | C | D | E | F | G | H | I | J | K | L | M | N |
| 可缩短的时间(周) | 2 | 1 | 1 | 1 | 2 | 1 | 1 | 0 | 2 | 1 | 1 | 0 | 1 | 3 |
| 增加的赶工费(万元/周) | 6.0 | 0.7 | 1.2 | 1.1 | 1.8 | 0.5 | 0.4 | 3.0 | 2.0 | 1.0 | 0.8 | 1.5 |

| 分部工程名称 | A | B | C | D | E | F | G | H | I | J | K | L | M | N |
| 可缩短的时间(周) | 2 | 1 | 1 | 1 | 2 | 1 | 1 | 0 | 2 | 1 | 1 | 0 | 1 | 3 |
| 增加的赶工费(万元/周) | 6.0 | 0.7 | 1.2 | 1.1 | 1.8 | 0.5 | 0.4 | 3.0 | 2.0 | 1.0 | 0.8 | 1.5 |

| 分部工程名称 | A | B | C | D | E | F | G | H | I | J | K | L | M | N |
| 可缩短的时间(周) | 2 | 1 | 1 | 1 | 2 | 1 | 1 | 0 | 2 | 1 | 1 | 0 | 1 | 3 |
| 增加的赶工费(万元/周) | 6.0 | 0.7 | 1.2 | 1.1 | 1.8 | 0.5 | 0.4 | 3.0 | 2.0 | 1.0 | 0.8 | 1.5 |

| 分部工程名称 | A | B | C | D | E | F | G | H | I | J | K | L | M | N |
| 可缩短的时间(周) | 2 | 1 | 1 | 1 | 2 | 1 | 1 | 0 | 2 | 1 | 1 | 0 | 1 | 3 |
| 增加的赶工费(万元/周) | 6.0 | 0.7 | 1.2 | 1.1 | 1.8 | 0.5 | 0.4 | 3.0 | 2.0 | 1.0 | 0.8 | 1.5 |