A.1.0MPa3min5min10min
B.1.0MPa5min5min10min
C.1.0MPa5min3min10min
D.1.0MPa3min3min10min
您可能感兴趣的试卷
你可能感兴趣的试题
A.[ζ]0.10.11.0
B.[ζ]0.20.11.0
C.[ζ]0.10.21.1
D.[ζ]0.20.21.0
A.425/0.4-0.45/10%/24
B.525/0.4-0.45/1%/24
C.425/0.4-0.45/1%/24
A.10%100MPa/min80%1h
B.10%80MPa/min80%2h
C.10%100MPa/min80%2h
D.10%80MPa/min80%1h
A.60.0kg70cm10cm40cm
B.63.5kg76cm15cm30cm
C.63.5kg70cm15cm40cm
D.60.0kg76cm10cm30cm
A.15×15×15cm320℃±3℃90%28天
B.10×10×10cm315℃±3℃85%28天
C.10×10×10cm315℃±3℃85%7天
D.15×15×15cm320℃±3℃90%7天
A.50×50×5020℃±3℃7天3个
B.50×50×5020℃±3℃5天3个
C.70.7×70.7×70.720℃±3℃28天6个
D.70.7×70.7×70.720℃±3℃15天6个
A.1:2.5/0.44或0.46/4×4×16cm3/3和6
B.1:1.25/0.5或0.6/5×5×18cm3/4和6
C.1:6/0.5或0.6/5×5×18cm3/4和3
D.1:2.5/0.44或0.46/4×4×4cm3/4和3
A.0.08mm200mm24h1.25~0.08mm
B.1.25mm200mm8h2.5~1.25mm
C.1.25mm100mm8h1.25~0.16mm
D.0.08mm100mm24h1.25~0.08mm
A.30次20min500kN6mm
B.25次10min400kN3mm
C.25次20min400kN6mm
D.30次10min500kN6mm
A.200mm
B.200mm
D.100mm
D.100mm
![](https://static.ppkao.com/ppmg/img/appqrcode.png)
最新试题
环氧树脂类粘结材料修补施工工艺()。①涂抹环氧砂浆②混凝土表面处理③养护④分层及填料⑤涂抹环氧基液
连续梁桥上部结构重点检查部位有()。
增大截面加固技术的优点有()。
与传统的桥梁加固方法相比,纤维复合材料加固技术优势有()。①不受构件形状限制、不改变截面尺寸②FRP加固对原结构不产生损伤③耐久性能优异④裂缝修复、刚度提高效果明显
对于斜拉桥的混凝土主梁,选出其三个加固方法()。①增大截面法②粘贴钢板法③粘贴纤维复合材料法④粘贴四氟乙烯板法
斜拉桥由于斜拉索的损伤或者腐蚀影响斜拉桥的安全使用时,将对斜拉桥的拉索进行更换,换索的流程是()。①对每个索按原实测索力进行张拉锚定②重新测定全桥索力和桥面高程,根据实测值再张拉进行索力调整③更换支座④在拉索外面增加4m长护索钢管
简支T梁受力特点为()。
增大截面加固技术植筋中的孔洞清理,用气泵和大于孔径()的毛刷进行清孔。
各种类型桥梁有下列()时,即可直接评定为不合格级桥和D级桥。①拱桥的拱脚处产生水平位移或无铰拱拱脚产生较大的转动②结构永久变形大于设计标准值③承载能力下降达25%以上④上部结构有落梁和脱空趋势或梁、板断裂
喷浆修补法施工工艺要求()。①喷射水泥砂浆前应对旧混凝土表面进行凿毛,并将表面清理干净,喷浆前1h,应洒水以保持受喷面充分湿润。②喷浆前应准备充足的砂子和水泥。③当修补要求设置钢筋网时,应有效固定。④喷射完工后应及时进行表面处理,采取遮荫和保湿等养护措施。⑤如需安装模板,应安装牢固,避免喷射作业的冲击力使模板脱落。⑥分层喷射时,应在第1层没有完全凝固时开始第2层的喷射,每层的间歇时间以2~3h为宜,若上层已凝固,应采用铁刷子将层间松层刷除,然后再继续喷射施工。