单项选择题If the feed pump for an auxiliary boiler fails to deliver the feed water to the boiler, the cause maybe ().

A.high steam pressure in the boiler
B.abnormally high feed water temperature
C.abnormally high boiler water temperature
D.steam demand exceeding feed pump capacity


您可能感兴趣的试卷

你可能感兴趣的试题

1.单项选择题Which of the following conditions can cause above normal air temperature to develop in the intake manifold of a four-stroke/cycle turbo-charged diesel engine?()

A.Clogged air intake falters
B.Piston blow-by
C.A defective after-cooler
D.Faulty exhaust valves

3.单项选择题The crankcase of many diesel engines are kept under a slight vacuum by the ().

A.scavenging action of the piston
B.piston type vacuum pump taking suction off a differential manometer
C.gland exhausting manometer
D.crankcase exhaust fan

4.单项选择题Fins are installed on the generating tube surfaces in waste heat boilers to ().

A.prevent soot fires in the exhaust system
B.prevent exhaust gas erosion of the tubes
C.increase the velocity of exhaust gas flow
D.increase the rate of heat transfer

5.单项选择题On a medium-speed main propulsion diesel engine, the crank-pin or crank journal bearings receive lubricating oil from ().

A.a spindle lubricator
B.an oil jet
C.internal splashing
D.drilled passages in the crankshaft

6.单项选择题The rate of cylinder lubricating oil metered to each cylinder of a large low-speed main propulsion diesel engine is ()

A.the same, whether at sea, or during maneuvering
B.adjusted during each hour of operation while at constant RPM
C.higher at sea than while maneuvering
D.lower at sea than while maneuvering

7.单项选择题The crankcases of many diesel engines are kept under a slight vacuum to ()

A.improve fuel economy
B.increase the air charge velocity
C.reduce the risk of explosion
D.all of the above

8.单项选择题Which of the following conditions could cause the feed pump for an auxiliary boiler to lose suction?()

A.Increased suction head pressure
B.Decreased feedwater temperature
C.Pump recirculating line being open too much
D.Excessive feedwater temperature

9.单项选择题In readying an auxiliary water-tube boiler for a routine hydrostatic test, which of the following procedures should be undertaken prior to filling the boiler with fresh water?()

A.The safety valve escape piping should be disconnected from the valve body and a blank inserted
B.The boiler vent valves should be opened
C.All handhole/manhole covers should be tightened up as much as possible to preclude any leaks
D.All of the above

10.单项选择题The fuel supply system to an automatic auxiliary boiler, will be automatically shutdown if the boiler ()

A.salinity is abnormally high
B.steam demand is too high
C.water level is abnormally low
D.feedwater flow is low