A.The designated person in charge
B.The tankerman
C.The senior able seaman
D.The oiler
您可能感兴趣的试卷
你可能感兴趣的试题
A.liquid chemicals in bulk
B.solid chemicals in bulk
C.chemicals in bulk
D.cargoes in bulk
A.check the flame arrester
B.check the fuel tank
C.check the battery
D.ventilate the bilges
A.provided that
B.on the part of
C.nevertheless
D.notwithstanding
A.A cargo handling room
B.A space in which cargo hose is stored
C.An enclosed space containing cargo piping
D.All of the above
A.None
B.One
C.Two
D.Three
A.Overloading
B.Over discharging
C.Overflow
D.Overtaking
A.filling completely
B.developing free surface
C.developing free surface moment
D.collapsing
A.filling a partially filled tank
B.using fuel from a pressed fuel tank
C.emptying a partially filled tank
D.transferring pipe from the setback area to the pipe rack
A.The tanks lie above the waterline and are filled
B.The tanks are partially filled with dry cargo
C.The tanks are partially filled with liquid cargo
D.The tanks are filled and lie below the waterline
A.fine
B.imprisonment
C.suspension or revocation of tankerman's document
D.All of the above
最新试题
Gasoline fuel tank vents should terminate().
Functions aboard a tanker or tank barge such as connecting,disconnecting,and topping off must be supervised by().
If the Certificate of Inspection of a damaged tank barge has expired,which certificate may be issued to allow its movement to a repair facility? ()
Each fire pump on a tanker must have a pressure gauge located at().
Every existing product carriers of 40000 tons deadweight and above shall be provided with segregated ballast tanks and shall comply with the specified requirements,or,alternatively,operate with()in accordance with the convention.
Air compressors are NOT permitted in which space(s) on a tank barge carrying grade A cargo?()
In order to reduce the accumulation of static electricity while loading petroleum products,you should().
Before you start an engine in a compartment,it’s MOST important to().
If you are bunkering and you close off one tank in the line of tanks being filled,the rate of flow to other open tanks on the same line will().
Every new crude oil tanker of 20000 tons deadweight and above shall be fitted with a cargo tank cleaning system using().