单项选择题A “spring line” is().

A.any wire rope used for mooring
B.a fire-warp
C.a mooring line running diagonally to the keel
D.a mooring line perpendicular to the keel


您可能感兴趣的试卷

你可能感兴趣的试题

1.单项选择题A “sheepshank” is used to().

A.keep a line from fraying
B.join lines of unequal size
C.stop off a line
D.shorten a line

2.单项选择题A “reaching” course is one in which the wind().

A.comes directly over the bow
B.comes directly over the stern
C.comes over an area extending from broad on the bow to the quarter
D.has no effect on the vessel

3.单项选择题A “Mediterranean moor” should be used when().

A.when anchoring in the Mediterranean
B.when docking stern to a berth
C.when docking bow to a berth
D.when anchoring in a strong current

4.单项选择题A “loose” tow may cause all of the following EXCEPT().

A.loss of maneuverability
B.lines to part
C.damage to the towing vessel and tow
D.a saving in the transit time

5.单项选择题A “liner” in riveted construction of a vessel is a(n) ().

A.small plate which fills the aperture between riveted strakes and the vessel framing
B.backing plate which is used to level the strakes while riveting,and then removed
C.internal frame to which the side shell is riveted
D.seam that is welded after riveting is completed

6.单项选择题A “full service” Loran-C receiver will provide().

A.matching pulse rates of at least 20 stations
B.an automatic on-and-off switch
C.a horizontal matching of all delayed hyperbolic signals
D.automatic signal acquisition and cycle matching

7.单项选择题A “figure eight” knot is used to().

A.be a stopper
B.shorten a line
C.join lines of equal size
D.keep a line from passing through a sheave

8.单项选择题A “fifteen-pound” CO2 extinguisher is so called because().

A.there are fifteen pounds of CO2 in the container
B.the container,when full,weighs fifteen pounds
C.the pressure at the discharge nozzle is l5 psi
D.the empty container weighs fifteen pounds

9.单项选择题A “check” line is().

A.a safety line attached to a man working over the side
B.used to measure water depth
C.used to slow the headway of a barge
D.used to measure the overhead height of a bridge

10.单项选择题A “bowline” is used to().

A.join lines of equal size
B.form a temporary eye (loop) at the end of a line
C.be a stopper
D.keep a line from fraying