A.工头
B.码头工人
C.装卸工人
D.领班
您可能感兴趣的试卷
你可能感兴趣的试题
A. HANDLE WITH CARE
B. CAUTION AGAINST WET
C. KEEP UPRIGHT
D. NO DUMPING
A. the load
B. safe working load
C. safe working
D. safe loading work
A. low-speed control
B. inching control
C. high-speed control
D. slow-speed control
A. dangerous cargo
B. flammable cargo
C. light cargo
D. heavy cargo
A. deck cargo
B. unpacked cargo
C. packed cargo
D. inboard cargo
A. dry bulk cargo
B. general cargo
C. liquid bulk cargo
D. refrigerated cargo
A.stevedore
B.docker
C.foreman
D.motorman
A. cargo wire
B. cargo runner
C. cargo fall
D. cargo tray
A. twist lock
B. lashing bar
C. bridge plate
D. bridge fitting
A. cargo chain
B. cargo tray
C. cargo hook
D. can hook
最新试题
The parts of the derrick are: derrick boom rest, gooseneck, center guy, stay, topping lift, topping lift block and so on.()
NO TURNING OVER()
We must use any stores carefully and return them after using.()
The safe working load of the derrick is 5 tons.()
Cargo handling gear is the most important deck fitting.()
Stores in Deck Department are: common tools, ropes, working protection gears, all kinds of paint and so on.()
Liquid bulk cargo is loaded and discharged by pumps.()
HANDLE WITH CARE()
Most general cargo ships have two derricks and two winches at each hatch.()
I’ll ask the electrician to repair the winch. ()