A.operated
B.operate
C.operating
D.operator
您可能感兴趣的试卷
你可能感兴趣的试题
A.high
B.heigh
C.height
D.higher
A.SLW
B.LSW
C.SWL
D.FWE
A. safe working load
B. safe work load
C. safe worked load
D. safely working load
A.What
B.Where
C.How
D.When
A.upwards
B.forwards
C.downwards
D.backwards
A.light
B.bright
C.tight
D.dark
A. For two hours.
B. At once.
C. In the holds.
D. Tomorrow.
A.look
B.give
C.keep
D.see
A.should
B.shouldn’t
C.must
D.can
A.care
B.careless
C.carelessness
D.careful
最新试题
Clamps have been used up, and we also need plenty of lashing wires.()
Must we unload the light cargo first?()
Please fix some cargo lights.()
The safe working load of the derrick is 5 tons.()
There is something wrong with the winch at hatch No.2.()
Cargo handling gear is the most important deck fitting.()
Liquid bulk cargo is loaded and discharged by pumps.()
Containers may be stowed both above and below deck.()
The parts of the derrick are: derrick boom rest, gooseneck, center guy, stay, topping lift, topping lift block and so on.()
Stores in Deck Department are: common tools, ropes, working protection gears, all kinds of paint and so on.()