单项选择题Cargo for ()No.4 is to be loaded first.

A.room
B.cabin
C.hold
D.winch


您可能感兴趣的试卷

你可能感兴趣的试题

1.单项选择题Bolts, nuts, split pins, hinges, wheels and stoppers should be frequently ().

A.checked
B.closed
C.removed
D.cleared

3.单项选择题The foreman said three ()would come on board to load cargo.

A.teams
B.parties
C.gangs
D.pairs

4.单项选择题The wire ropes and blocks, or pulleys, on a ship are called ().

A.fittings
B.riggings
C.equipment
D.device

5.单项选择题Each cover consists of two or ()panels.

A.two
B.one
C.more
D.much

6.单项选择题A ()is at the end of the cargo runner for picking up the load.

A.sling
B.hook
C.block
D.tackle

7.单项选择题The ()is fixed at the bottom of the derrick.

A.gooseneck
B.block
C.derrick step
D.crane

8.单项选择题The ()is pumped onto the ship at the loading port by shore pumps.

A. oil
B. gas
C. water and fuel
D. timber

9.单项选择题The standard size of the containers is ()high.

A.9ft
B.8ft
C.8m
D.9m

10.单项选择题This is deck cargo. ()stow it in the holds.

A.Not
B.Notto
C.Don’t
D.Can