A. The work of opening and closing hatches is usually done by crew members.
B. The work of opening and closing hatch covers is usually done by crew members.
C. The work of opening hatch covers is usually done by crew members.
D. The work of closing hatch covers is usually done by crew members.
您可能感兴趣的试卷
你可能感兴趣的试题
A. After loading and discharging, hatch covers will be opened.
B. After loading and discharging, hatch covers will be closed.
C. Before loading and discharging, hatch covers will be opened.
D. Before loading and discharging, hatch covers will be closed.
A. the guide rail
B. the guide rope
C. the side coaming
D. the guide roller
A.why
B.when
C.how
D.what
A. the open valve
B. the stop valve
C. the steam valve
D. the close valve
A. monthly
B. every three months
C. once monthly
D. every two months
A.foreman
B.operator
C.opener
D.stevedore
A. The cargo runner
B. The cargo block
C. The derrick sling
D. The lashing wire
A.gangway
B.bow
C.boiler
D.stern
A. Light cargo
B. Wet cargo
C. Heavy cargo
D. Bulk cargo
A.dry
B.fragile
C.smelling
D.dangerous
最新试题
NO DUMPING()
We are loading dangerous cargo now.()
HANDLE WITH CARE()
I am adjusting the derrick. It is a little higher.()
We must use any stores carefully and return them after using.()
STOW AWAY FROM BOILER()
The parts of the derrick are: derrick boom rest, gooseneck, center guy, stay, topping lift, topping lift block and so on.()
NO TURNING OVER()
Please fix some cargo lights.()
Stores in Deck Department are: common tools, ropes, working protection gears, all kinds of paint and so on.()