A.由远而近,由小到大 B.由远而近,由大到小 C.由近而远,由小到大 D.以上都不对
A.0.5m B.0.6m C.0.7m D.0.8m
A.附加埋设深度 B.覆盖水泥盖板 C.采用关节型套管 D.采用S型埋设
A.0.6m,0.8m,0.8m,1.2m B.0.6m,1m,1m,1.2m C.0.4m,0.8m,0.8m,1.2m D.0.8m,1m,1m,1.2m
A.6 B.7 C.8 D.9
A.40m B.50m C.60m D.70m
A.钢管 B.上覆水泥盖板 C.水泥槽 D.铺砖
A.终端杆或终端跨越杆应装设四方拉线或转角120°的三方拉线(单杆用),顶头拉线条数为每条吊线用比吊线程式高一级的顶头拉线 B.地面杆高超过15m的接杆或单杆,应在电杆接合部位或每隔约7m处加装四方拉线或三方拉线一层,拉线程式同吊线的钢绞线程式 C.跨越杆上安装与吊线程式相同的四方拉线一层(H杆左右两杆各装1条顺线拉线) D.在拉线地锚强度范围内,多层拉线尽可能采用“v”型拉线装置
A.7/2.2 B.7/2.6 C.7/3.0 D.7/4.0
A.10mm B.50mm C.100mm D.1m