单项选择题The shipper is deemed to have guaranteed the accuracy at the time of shipment of the quantity and weight as furnished by him,and must indemnify()against all losses,damages and expenses arising from the inaccuracies in such particulars.

A.the Charterer
B.the Shipowner
C.the merchant
D.the shipper


您可能感兴趣的试卷

你可能感兴趣的试题

9.单项选择题The final inspection responsibility for seeing that a tank barge is provided with the required equipment and fittings in good and serviceable condition prior to loading cargo rests with the ().

A.terminal operator
B.owner of the barge
C.tankerman or person in charge of loading
D.charterer through the Master of the towing vessel

最新试题

The consignee’s refusal to take delivery,or failure to do so within a reasonable time,also puts an end to()liability as a carrier.

题型:单项选择题

We must take the Charterer’s benefit()full consideration.

题型:单项选择题

The Charterers to have option of using Owners’ bunker contracts. This sentence indicates that().

题型:单项选择题

If the Shipowner makes an innocent misrepresentation which induces the Charterer to sign the contract,the Charterer may be entitled to()the charter-party.

题型:单项选择题

Should it appear that war or blockade would prevent the vessel from safely reaching the port of destination and / or discharging the goods thereat,the Carrier().

题型:单项选择题

It is not the Charterer’s duty that().

题型:单项选择题

That the Shipowner has broken a condition precedent will()the Charterer from the liability to provide a cargo.

题型:单项选择题

The shipper is deemed to have guaranteed the accuracy at the time of shipment of the quantity and weight as furnished by him,and must indemnify()against all losses,damages and expenses arising from the inaccuracies in such particulars.

题型:单项选择题

The cesser clause mainly purports to relieve()from paying demurrage.

题型:单项选择题

The final inspection responsibility for seeing that a tank barge is provided with the required equipment and fittings in good and serviceable condition prior to loading cargo rests with the ().

题型:单项选择题