单项选择题Why are most break bulk vessels built with the transverse framing system rather than the longitudinal system? ()

A.The transverse system is more resistant to hog and sag stresses
B.The numerous longitudinal frames cause excessive broken stowage
C.The transverse system provides better support to the varying cargo densities on a break bulk vessel
D.The deep web frames interfere with the stowage of break bulk cargo


您可能感兴趣的试卷

你可能感兴趣的试题

1.单项选择题While your vessel is docked port side to a wharf,a sudden gale force wind causes the vessel’s stern lines to part. The stern begins to fall away from the dock,and no tugs are immediately available. Which measure(s) should you take FIRST?()

A.Notify the engineroom of the need for propulsion
B.Shut down any cargo transfer that's in progress
C.Let go the port anchor and veer to a short scope of chain
D.Obtain assistance from the terminal to put new stern lines out

4.单项选择题While loading cargo,a white trimming light on the starboard side comes on. This indicates that().

A.the vessel has a list of about 1` to starboard
B.the chutes should be directed to the starboard side
C.the chutes in No. 1 hold should be directed to the starboard side
D.a severe list to starboard has developed and all loading should cease

5.单项选择题Which vessel is NOT classified as “restricted in her ability to maneuver”? ()

A.A vessel picking up a navigation mark
B.A vessel transferring cargo while underway
C.A vessel whose anchor is fouled
D.A vessel in a towing operation that restricts the ability of the vessel and her tow to change their course

6.单项选择题Which variable factor affects the initial lashing requirements aboard Ro-Ro vessels? ()

A.Age of vehicle or cargo unit
B.Size and weight of vehicle/cargo unit
C.Reputation of shipper concerning condition of cargo
D.Air pressure in the vehicles tires

7.单项选择题Which statement(s) is/are TRUE concerning crane cargo operations? ()

A.Do not exceed rated load capacity of crane and container spreader or slings
B.During any cargo handling operation,the safety of personnel is paramount
C.Cargo handlers must be outfitted with adequate protection from personal injury
D.All the above

8.单项选择题Which statement is TRUE concerning the tandem working arrangement of pedestal cranes when completing a quad lift? ()

A.The discharge is slow due to the size of the cargo and all the cranes working together
B.The cargo discharge can be accomplished with controlled pendulation
C.The cargo discharge can be performed in port or at anchor
D.The cranes enable the handling of heavy cargos without shoreside assistance

最新试题

If any cargo is damaged,the insurance company usually pays to the cargo owner a sum of money equal to the value of().

题型:单项选择题

If the carrier is responsible for the damage or loss of the cargo,()will have to pay to the insurance company.

题型:单项选择题

If the Charterer sends a vessel to an unsafe port,and she is damaged as a result,he will have to indemnify the().

题型:单项选择题

You are carrying cargoes of crotonaldehyde,phosphoric acid,and morpholine on your multiple-product tanker. Which of the following statements is TRUE? ()

题型:单项选择题

You are carrying triethylamine,methyl methacrylate and isoprene in your multiple-product tanker. Which of the following statements is true? ()

题型:单项选择题

With a given load on the cargo hook,the thrust on a cargo boom().

题型:单项选择题

Horizontal subdivision decks forming watertight compartments in the columns of a semisubmersible ship increase the unit’s().

题型:单项选择题

Electrical wiring on all “T-Boats” must be()。

题型:单项选择题

If the goods are not taken delivery of by the receiver from alongside the vessel without delay,the carrier shall be at liberty to land such goods on shore or any other proper places ().

题型:单项选择题

You are discharging cargo and the inert gas system is in operation to inert the tanks. The pressure in a tank being discharged starts to drop below the allowable limit. What action should you take? ()

题型:单项选择题