A.More than six short blasts and one long blast on the whistle
B.Continuous blast of the ships whistle for a period of not less than 10 seconds supplemented by the same signal on the general alarm
C.Three short blasts of the whistle supplemented by the same signal on the general alarm
D.More than six short blasts and one long blast on the whistle supplemented by the same signal on the general alarm
您可能感兴趣的试卷
你可能感兴趣的试题
A.mechanical foam
B.chemical foam
C.carbon dioxide
D.soda acid
A.Dry chemical
B.Halon
C.Low velocity fog
D.Steam
A.abandon ship
B.dismissal from drills
C.fire and emergency
D.lower lifeboats
A.6 short blasts and 1 long blast
B.long blast mare than 6 short blasts
C.more than 6 short blasts and 1 long blast
D.1 long blast of at least 10 seconds
A.remain in the vicinity of the vessel
B.head for the closest land
C.head for the closest sea-lanes
D.get a majority opinion
A.thirsty
B.sick or injured
C.wet
D.awake
A.flash point
B.auto-ignition point
C.volatility point
D.upper explosive limit
A.require ballast added to only the port side tanks
B.be down by the head
C.sink
D.float
A.stop ventilation to the area
B.stop the vessel
C.secure electricity to the circuit
D.apply CO2 to the fire
A.secure the fuel manifold
B.shut off power to the pump
C.shut off the power ventilation
D.spray water on the fire
最新试题
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
Which of the following items don’t belong to dock repair works?()
If separating effect is not good, which measure should be taken ()
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
Diesel engine air start system check valves are opened by ()
() is not installed on the main switchboar.
The ISPS Code consists of a mandatory section-Part A, which shows()