A.pSeries and xSeries use different file systems. Consolidating Storage and backup is not achievable.
B.Consolidation is possible by connecting pSeries local storage to the xSeries SQL server using the IXA adapter.
C.Storage consolidation can be achieved by connecting the pSeries and xSeries servers to a common DS4000 storage server.
D.Storage consolidation is only achievable when raw file systems are used by the databases and both servers run the same Linux file system (e.g., EXT3 or Reiser).
您可能感兴趣的试卷
你可能感兴趣的试题
A.Ensure that the EMC storage is listed on the IBM Server Proven website
B.Ensure that the x445 is listed on the EMC Hardware Compatibility website
C.Ensure that the x445 and the EMC storage server are listed on Novell’s SuSE Supported Hardware website
D.Build a proof of concept system at the customer site to demonstrate functionality
A.IBM Redbooks
B.IBM Announcement Letters
C.ServerProven website
D.Configuration and Options Guide (COG)
A.Deployment
B.Software maintenance
C.Driver updates
D.Disposal
E.Software inventory
A.VMWare is licensed per system so no extra charge for SMP support
B.Lowering administration cost while providing better remote management tools
C.The x445 provides high availability options designed to minimize system outages
D.The x445 provides no single point of failure
E.The x445 provides SAN Connectivity right out of the box without needing to purchase extra hardware
A.Has a SATA drive expansion enclosure been considered for the DS4300?
B.Is there a concern for overall disk subsystem I/O performance?
C.Has an IBM Director Server been considered to monitor the environment?
D.What will their storage requirements be over the next 12 months?
A.8-way x445 with Microsoft Windows Server 2003 Standard Edition
B.8-way x445 with Microsoft Windows Server 2003 Datacenter Edition
C.8-way x445 with Microsoft Windows Server 2003 Enterprise Edition
D.16-way x445 with VMWare ESX with SMP and Windows Server 2003 Standard Edition VMs
A.Verify that the Dell systems have TCP/IP enabled
B.Verify that the systems are running the IBM Director Agent
C.Verify that the managed systems are SMBIOS 2.1 and WfM 2.0 compliant
D.Verify that the Dell systems have at least a 1GB of memory installed
E.Install an SNMP agent on the Dell systems as IBM Director cannot manage Industry Standard non-IBM servers
A.Capacity Manager
B.Resource Monitors
C.System Availability
D.System Performance Monitor
A.zSeries
B.pSeries
C.iSeries
D.iSeries with IXA Adapter
A.The new server is not PXE-enabled.
B.The RDM agent is not configured on the RDM server.
C.The IBM Director agent is not installed on the new server.
D.A DHCP server is not installed or configured the network.
最新试题
A customer’s server is experiencing slow application response due to lack of processor power. In which one of the following systems would the addition of the Expand On Demand processor upgrade feature benefit future expansion?()
An application vendor wants to choose a fault tolerant platform for their new application. The application benefits from multiple processors and has been tested on Red Hat Advanced Server 3. To determine the memory requirements for the application, which of the following is the best procedure?()
A startup company recently lost their critical database due to hardware failure on a Windows 2003 4-way processor server running 32-bit applications and an out-dated backup due to a narrow backup window. To prevent this situation from happening again, the solution proposed must be cost effective, scale to 16-way and allow for future storage expansion. Which TWO of the following options should the consultant recommend?()
A company installed a new server to manage its electronic image storage. They have two distinct image sizes: 2KB and 16KB. Two distinct arrays are created on a ServeRAID adapter. The first array will store all of the 2KB images, and the second array will store all the 16KB images. The RAID stripe size was left at the default size of 8KB. After installation, a performance problem is identified. According to performance monitoring, 80% of the images are 16KB. Which of the following will best optimize performance?()
A customer needs to deploy a SAN and connect nine servers running a mix of Windows and Linux. They currently need 12TB, but their growth requirements will be tripled in the near future. They will also consolidate 18 legacy Windows servers onto one system using virtualization software and connect that server to the storage solution. A DS4000 series backup solution needs to be included in the design. Which of the following solutions will satisfy these requirements?()
A customer purchased a new IBM xSeries x445. They already have a non-IBM industry standard rack with 14U of open space that is being considered to house the new server. The rack houses an existing UPS unit for the entire rack. Which of the following questions is most important to ensure that the power in the datacenter environment is ready for the initial install?()
An x445 with two 3.0GHz DP processors and 2GB of RAM is running a processor-intensive floating-point geological application that calculates pressures in the earth’s crust. It takes a long time for each calculation, and the director of computing wants the calculations to take less time. Memory addressed by the application may also be a bottle neck. Which of the following will most improve the ability to run the calculations in less time?()
A customer has the need to implement a tape backup solution to backup a 500GB database on a daily basis. Which of the following factors is the most important consideration in the design of a backup and restore solution?()