A.The application should be tested and baselines should be measured with simulated user loads.
B.The application should be tested with the minimum amount of memory then increase the memory in increments until an acceptable response is achieved.
C.The application should be tested with differing amounts of memory and the fastest response time is reached it should be used as the acceptable configuration.
D.The application should be tested with the maximum amount of memory then decrease the memory in increments until an acceptable price/performance ratio is reached.
您可能感兴趣的试卷
你可能感兴趣的试题
A.Do the web servers require SMP capability?
B.Is the web content static or dynamic information?
C.What is the average CPU utilization of the existing web servers?
D.Will the servers need a SCSI or Fibre Channel storage solution?
E.What are the expected growth rates for the web servers?
An online retailer is considering deploying a database application on xSeries and Windows to serve their Web-based transactions. The database will need about 4TB of usable storage. Downtime costs the customer tens of thousands of dollars per minute, so system availability will be of highest priority. The customer needs to acquire the system within a certain budget but will pay for things that provide higher system availability.
Which of the following will be the most appropriate solution?()
A.A dual pathed switched DS4000 Solution with Clustering, Remote replication, Redundant NICs, and Fibre attached backup
B.A single path Direct attach DS4000 solution implemented with Clustering and SAN Based Backup combined with IBM Director for PFA management
C.A dual pathed Direct Attach fibre solution, along with dual NICs and memory mirroring
D.An iSCSI solution with dual NIC’s with the Flashcopy option enabled on the DS300
A.Install a longwave GBIC in the office SAN switch and string a multimode fibre from the office to the manufacturing floor
B.Install a longwave GBIC in the office SAN switch and string a singlemode fibre from the office to the manufacturing floor
C.Install a shortwave GBIC in the office SAN switch and string a multimode fibre from the office to the manufacturing floor
D.Install a shortwave GBIC in the office SAN switch and string a singlemode fibre from the office to the manufacturing floor
A.Use write-back cache with battery backup enabled
B.Use write-through cache with battery backup enabled
C.Use read-back cache with battery backup enabled
D.Use read-through cache with battery backup enabled
A.Place both the database and transaction log on two logical drives in one RAID-10 array
B.Place both the database and transaction log on two logical drives in one RAID-1E array
C.Place the database on a RAID-1E array and place the transaction log on a separate RAID-5 array
D.Place the database on a RAID-5 array and place the transaction log on a separate RAID-1E array
A.Seek Time
B.Drive RPM
C.Data Transfer Rate
D.Rotational Latency
A.Disable the ServRAID cache
B.Change the RAID level to 10
C.Change the cache level to Write Through
D.Add five more drives to the array to increase the number of read/write heads
A.NAS runs on 2Gb fibre, which will provide better performance.
B.NAS uses WAN infrastructure, which can easily span the 1 KM gap.
C.NAS requires fibre storage, which allows dual paths for redundancy.
D.NAS requires iSCSI routers and offers better growth environment.
A.The ability to interleave writes to the array
B.High Availability and failover
C.LUN sharing via Target Mode SCSI on the storage system
D.A greater number of LUNS available on the same storage system
A.Change the stripe size on the RAID controller
B.Change the stripe size to 1024K on the RAID controller
C.Change the stripe size on the RAID controller for the first array
D.Change the stripe size on the RAID controller for the second array
最新试题
An xSeries specialist monitors a customer’s server that has poor performance. The customer is running an x365 with a ServeRAID 6i controller with write-back cache turned on and ten 15K rpm drives in a RAID-5 array. It is a mission-critical server and must have a redundant storage system. Performance tests indicate that the Average Disk sec/Transfer exceeds 20 ms. Which of the following is the lowest-cost method to increase the throughput?()
An application vendor wants to choose a fault tolerant platform for their new application. The application benefits from multiple processors and has been tested on Red Hat Advanced Server 3. To determine the memory requirements for the application, which of the following is the best procedure?()
A company has two x346 servers each attached to their own EXP400 containing 367GB of raw SCSI storage. They want to consolidate their storage infrastructure into a scalable, high availability solution at minimum cost. Which of the following storage solutions best satisfies the customer’s requirements?()
A customer asked a consultant to create the infrastructure for an application. The application is designed to charge customers for conferencing services based on usage. To determine if a Storage Area Network (SAN) is the best storage solution, which of the following questions is most appropriate?()
A company wants to run multiple applications on an x445 to serve their user base. OS and application licensing cost is a factor. Which TWO questions will help the specialist decide on the operating environment and the number of processors per server?()
A customer is building a database server, and the server does sequential write most of the time. They are planning to use an IBM x445 and a ServeRAID-6M adapter. Which of the following fault tolerant RAID levels will perform best for sequential write?()
A customer has the need to implement a tape backup solution to backup a 500GB database on a daily basis. Which of the following factors is the most important consideration in the design of a backup and restore solution?()
A startup company recently lost their critical database due to hardware failure on a Windows 2003 4-way processor server running 32-bit applications and an out-dated backup due to a narrow backup window. To prevent this situation from happening again, the solution proposed must be cost effective, scale to 16-way and allow for future storage expansion. Which TWO of the following options should the consultant recommend?()
A company wants to consolidate 20 existing dual processor Pentium III servers, all running a web server application on Windows Server 2003. They are considering consolidating to a single x445 running VMWare ESX. Which TWO of the following questions will provide enough information to determine the correct processor configuration?()
A manufacturing company has a large facility which has its offices at one end and a manufacturing floor at the other. The company is looking to implement new equipment that requires access to the company’s SAN that is over 2.4 kilometers away in the office area. Which of the following solutions will satisfy this requirement?()