A、Order a new HMC to support the p5 system.
B、Attach the new p5 system to the existing HMC.
C、Upgrade the existing HMC to accommodate both the POWER4 and p5 systems.
D、Do nothing. This system does not require an HMC.
您可能感兴趣的试卷
你可能感兴趣的试题
A.Sum of SPECfp values
B.Sum of rPerf values only
C.Sum of rPerf and ROLTP values
D.Sum of SPECint and SPECjbb values
A.1
B.2
C.3
D.4
A.It will require additional SCSI adapters and I/O drawers or external disks to support more than two LPARs.
B.It has sufficient built-in SCSI controllers and disk enclosures to support four total LPARs by only adding the necessary additional disks.
C.It is unable to use internal disks for LPARs and therefore additional adapters I/O drawers or external disks must be used to support all LPARs.
D.It can support six LPARs with internal disks but will require special features, cables and an adapter to support the additional LPARs with internal disks.
A.A p650 running AIX v5.3
B.A p5-550 running AIX v5.3
C.A p5-570 running Advanced POWER Virtualization
D.Multiple rack-mounted p615s running dynamic LPAR
A.Two p670 servers
B.Four p650 servers
C.Two p5-570 servers
D.Four p5-550 servers
A.System dimensions and weight, system power and cooling requirements, and list of supported OEM racks
B.System dimensions and weight, list of supported OEM racks, and requirements for installing IBM systems into OEM racks
C.System performance specs, system power and cooling requirements, and requirements for installing IBM systems into OEM racks
D.System dimensions and weight, system power and cooling requirements, and requirements for installingIBM systems into OEM racks
Which of the following benchmarking ratings cover essentially the same performance metrics associated with commercial applications for IBM UNIX systems?()
A.A
B.B
C.C
D.D
A.xSeries specialist,as the customer may have some Intel-based systems.
B.Hardware customer engineer,as they will be installing the entire solution.
C.Services specialist,as they can provide education recommendations for the entire solution.
D.Storage specialist,as the customer may need disk to store the data and tape to backup the data.
A.A modem adapter
B.An async adapter and serial cable
C.An Ethernet adapter
D.A 9-pin to 25-pin converter and serial cable
A.p650
B.p5-570
C.Two p630s
D.p5-570 Express
最新试题
A bank is interested in technology that will enhance competitiveness and flexibility in the financial trading market by harnessing the typically unused power of idle machines. The pSeries technical specialist should make the customer aware of which IBM offering?()
A customer wants to run eight production partitions each with the following: ? 0.7 CPU 1.65-GHz ? 4GB of RAM ? 2 Ethernet adapters They do not have room for many RIO drawers since rack space is currently scarce in their data center. They have significant unused SAN attached disk. In addition to the Advanced POWER Virtualization feature, which of the following is the minimum recommended configuration needed to meet the customer’s requirements?()
A customer is having problems after an AIX version upgrade from 5.2 to 5.3. Which of the following should the pSeries technical specialist recommend that the customer call?()
A customer wants to upgrade an existing pSeries system. In addition to retrieving the IBM configuration records, what else should be done to ensure an accurate upgrade quote is provided?()
A customer needs detailed information on the internal architecture of the new p5-570. Which of the following is the most appropriate place to get this documentation?()
A customer is planning to migrate a financial application to a 12-way p5-570 system with 96GB of memory. The application data is stored on an ESS Model 800 attached to a p670 server with AIX 5.2. They will have a short outage window to perform the data migration. What is the quickest way to move all the data stored on the attached ESS from the p670 to the new p5-570?()
The pSeries technical specialist has been invited to a briefing on the latest POWER technology as a representative of their team. What should the specialist offer to do upon return from class in order to best prepare the rest of the team for the introduction of the new technology?()
A customer has an 8-way p5-570 with eight internal disk drives and AIX 5.2. Which of the following must be added, if anything, to the configuration to support four LPARs, assuming each LPAR requires twodisk drives?()
A customer needs both a database and application server to communicate over a network. The new systems will be connected to the same network as the current IBM equipment with known IBM serial numbers. How could a pSeries technical specialist best determine which type of network card is appropriate, without making an additional call to the customer?()
A customer has asked for a p690 system with the following requirements: ? 32 1.9ghz processors ? 128GB of memory ? 20 fiber adapters ? 7 network cards ? 10 LPARs What is the most appropriate question to ask them in order to build the hardware configuration correctly?()