A.A pool of physical memory that can be used by any partition
B.A pool of physical processors that can be used by any virtual or dedicated partition
C.A pool of physical memory that can be used by multiple Micro-Partitions
D.A pool of physical processors that can be used by multiple Micro-Partitions
您可能感兴趣的试卷
你可能感兴趣的试题
A.The ability to install a Linux system on an AIX system
B.The ability to install an AIX system on a Linux system
C.The ability to compile and run a Linux application on AIX
D.The ability to compile and run an AIX application on Linux
A.The POWER5 system has greater memory and processor granularity and can also run both Linux and AIX at the same time in different LPARs.
B.The POWER5 system supports more partitions, processors, and memory than any competitor’s solution.
C.The POWER5 system has the lowest partitioning overhead and can also run both Linux and AIX at the same time in different LPARs.
D.The POWER5 system supports more partitions and has the lowest partitioning overhead.
A.Send a flyer on new p5-520.
B.Provide shipment delivery status.
C.Order a new system per the purchase order.
D.Retrieve and send a whitepaper on SCSI performance.
A.Combine the file/print servers onto a larger Intel-based machine (x445).
B.Bring up a Linux LPAR on the pSeries and run Samba to provide file/print services.
C.Bring up another AIX LPAR on the pSeries and run Samba to provide file/print services.
D.Bring up another AIX LPAR on the pSeries and run Connect Direct to provide file/print services.
A.Refuse to work with the account team unless they are brought in right at the beginning.
B.Talk to the account team and ask them to bring them in earlier so that they can better understand the account.
C.Explain the situation to the customer and ask them to talk to the account team about bringing them in earlier.
D.Explain the situation to the sales manager and ask him to talk to the account team about bringing them in earlier.
A.Techline
B.Consultline
C.Operational Support Services - Alert for pSeries
D.Operational Support Services - RS/6000 SystemWatch
The pSeries technical specialist is discussing a proposed solution for a commercial application that contains the following options: p670, p690, and p5-570. The customer asks why a p655 was not considered as a solution. The customer’s requirements include the following:
? Eight 1.5 or 1.7GHz processors
? 64GB memory
? 12 fibre adapters
? 11 network adapters
? An estimated 25% growth in the next year
What is the most appropriate response to the customer?()
A.The p655 is much more expensive than the other solutions.
B.The p655 would be at full capacity and would have no room for the growth.
C.The p655 is an HPC system and should never be used in a commercial situation.
D.The p655 does not support more than 20 adapters so could not accommodate the requirements.
A.The technical specialist has supported multiple Cluster 1350 environments. References will be provided.
B.The technical specialist is Linux-certified by two industry groups. Certificate copies will be provided.
C.The technical specialist has worked on multiple UNIX consolidation projects. References will be provided.
D.The technical specialist has worked on Linux consolidation efforts. References will be provided.
A.Pre-order, pre-installation
B.Post-order, pre-installation
C.Pre-order, post completion sign-off
D.Pre-installation, post completion sign-off
最新试题
A state agency has recently deployed a new application on an 8-way p5-570 that is critical to the agency’s operation. There is no manual method to perform the business process. The state government has just mandated that all state agencies have disaster recovery plans that allow the agencies to recover critical applications in acceptable periods of time with no loss of performance. Based on this new business requirement, what is this agency most likely to need?()
A customer has a large UNIX environment and has engaged a pSeries technical specialist to work on a solution with them. Which of the following statements would best establish UNIX credibility with a knowledgeable customer?()
A customer is getting ready to install a new pSeries system into their data center. They are concerned about providing the appropriate clearance around their 7014-T42 to allow for maintenance. What reference material should the pSeries technical specialist provide to the customer?()
A customer is considering multiple options for a particular set of workloads on AIX v5.2. They need to run ten identical LPARS, each containing four fibre cards, two 2-port Ethernet cards, and one SCSI card as well as two internal boot disks. They want the LPARS to be split across two physical systems for redundancy purposes; cost is an issue. They need a total of approximately 40 rPerf for all ten workloads. Which of the following solutions best fits these needs?()
A customer needs a new 4-way p630 with three partitions to support three AIX 5.2 applications. Each partition requires two of the following: OS boot drives, fiber adapters, and gigabit Ethernet adapters. The customer has an HMC with an available serial port. In addition to the model 6C4, which of the following is required to meet the customer’s requirements?()
A customer asks the pSeries technical specialist to recommend which remote access (SSH or Telnet) method to use. What question should the customer be asked to best determine the proper recommendation?()
A customer is evaluating an IBM commercial solution against a 16-way rx8620 Integrity (Itanium). The pSeries technical specialist should lead with which of the following IBM systems?()
A customer has an 8-way p5-570 with eight internal disk drives and AIX 5.2. Which of the following must be added, if anything, to the configuration to support four LPARs, assuming each LPAR requires twodisk drives?()
A customer wants to upgrade an existing pSeries system. In addition to retrieving the IBM configuration records, what else should be done to ensure an accurate upgrade quote is provided?()
A customer is adding a new p5 machine to their environment. The machine will host several DB2 partitions running AIX 5.2. They currently have two SAN directors and an IBM ESS. The SAN design allows for concurrent maintenance. What is required on each partition to attach to the SAN?()