A customer is considering multiple options for a particular set of workloads on AIX v5.2.
They need to run ten identical LPARS, each containing four fibre cards, two 2-port Ethernet cards, and one SCSI card as well as two internal boot disks.
They want the LPARS to be split across two physical systems for redundancy purposes; cost is an issue.
They need a total of approximately 40 rPerf for all ten workloads. Which of the following solutions best fits these needs?()
A.2 x p655 1.7ghz 8-way servers (21.87 rPerf each)
B.2 x p670 1.5ghz 8-way servers (24.18 rPerf each)
C.2 x p690 1.7ghz 8-way servers (27.11 rPerf each)
D.2 x p650 1.45ghz 8-way servers (18.67 rPerf each)
您可能感兴趣的试卷
你可能感兴趣的试题
A.Voltage
B.Frequency
C.Power Source Loading (max)
D.Power Source Loading (typical)
A.Ask the customer to confirm which option is best for their environment.
B.Order the fibre channel option and purchase a converter later if necessary.
C.Order both SCSI and fibre channel adapters to cover both potential options.
D.Inform the customer that fibre channel was selected for performance reasons.
A company has recently placed an order for a POWER4+ p650 server.
Their facilities manager has approached the pSeries technical specialist to gather information on the correct power receptacle for thenew server.
They have requested a picture of the power cord plug to show to their electrician.
Where would the pSeries technical specialist find the required information?()
A.Sales Manual
B.Announcement Letter
C.POWER4+ p650 Specification Sheet
D.Site and Hardware Planning Information Manual
A.Add a PCI-X Dual Channel Ultra320 SCSI Adapter (FC 5712).
B.Add a PCI-X Fibre Channel Adapter (FC 5716).
C.Add the optional External SCSI Port Enablement Cable (FC 4273).
D.Use the integrated external SCSI port on the p5-570 Express server.
A.p690 with Dynamic LPAR
B.Grid of SP switch-attached p5-550s
C.p690 with Advanced POWER Virtualization
D.p5-570 with Advanced POWER Virtualization
A customer wants to take advantage of IBM’s Micro-Partitioning capabilities for their new AIX applications.
The pSeries technical specialist should recommend purchasing which of the following?()
A.p5 hardware, AIX 5.2, Virtual I/O Server
B.POWER4 hardware, AIX 5.3, Virtual I/O Server,
C.p5 hardware, AIX 5.3, Advanced POWER Virtualization feature
D.POWER4 hardware, AIX 5.2, Advanced POWER Virtualization feature
A.Decide not to bid.
B.Provide a solution in the bid.
C.Provide a disclaimer in the bid.
D.Discuss options with the customer.
A customer’s new rack contains 12 x p655 servers.
The customer currently has an HMC with one 128-port async adapter with a rack mounted 16-port RAN. The HMC is already attached to two pSeries p630s.
What upgrades, if any, are needed to the HMC to support the new p655 servers?()
A.No upgrades are needed.
B.Add another 16-port RAN.
C.Add an 8-port async adapter.
D.Add an additional 128-port adapter.
A.To revalidate the total solution
B.To overcome objections to the solution
C.To review the pricing with the customer
D.To ensure the customer has the correct applications
A.Optional 4-pack
B.7311-D20 RIO drawer
C.Optional 4-pack and a 7311-D20 RIO drawer
D.Optional 4-pack attached to a PCI SCSI card
最新试题
A customer is adding a new p5 machine to their environment. The machine will host several DB2 partitions running AIX 5.2. They currently have two SAN directors and an IBM ESS. The SAN design allows for concurrent maintenance. What is required on each partition to attach to the SAN?()
A customer is experiencing problems with a failed disk drive on their newly purchased p630 server. The IBM CE has replaced the disk and now the mirrored Logical Volume needs to be re-created. The customer does not have the skills to do this. There is no support contract with the solution provider but the p630 is covered under a Software Maintenance Agreement (SWMA) 24/7 contract. What should the pSeries technical specialist do first?()
A customer has defined their server needs as a four-LPAR 16-way p570 with 64GB of memory, four 10/100/1000 TX LAN adapters, and six fibre channel adapters to external storage in an IBM ESS (Shark). They like the idea of being able to do SAN maintenance while not incurring downtime. If all LPARs are production related and similar, which question is most appropriate for the pSeries technical specialist to ask?()
A customer has an 8-way p650 running an application for about 200 users. In the past, the requiredamount of memory and processors has increased proportionally to the number of new users. The customer plans to increase users by 10% each year for the next three years. Next year, a database will be added to the workload to support the users directly rather than being on a separate machine. What is the most likely result of this projected growth?()
A customer asks the pSeries technical specialist to recommend which remote access (SSH or Telnet) method to use. What question should the customer be asked to best determine the proper recommendation?()
The pSeries technical specialist has been invited to a briefing on the latest POWER technology as a representative of their team. What should the specialist offer to do upon return from class in order to best prepare the rest of the team for the introduction of the new technology?()
A customer has a failing HBA adapter and needs to identify the location of the adapter. Which of the following AIX commands should the specialist recommend the customer review?()
A bank is interested in technology that will enhance competitiveness and flexibility in the financial trading market by harnessing the typically unused power of idle machines. The pSeries technical specialist should make the customer aware of which IBM offering?()
A customer has just obtained a second data center through the acquisition of a competitor. The IT Director is now seeking to merge,integrate,and rebalance systems across the two data centers over thenext two years. They have just deployed a high-speed point-to-point circuit between the facilities. The IT Director would like a system that could backup their AIX and Win2K servers and electronically vault the data between sites as part of their Disaster Recovery Plan. What product should the pSeries technical specialist recommend for this requirement?()
A state agency has recently deployed a new application on an 8-way p5-570 that is critical to the agency’s operation. There is no manual method to perform the business process. The state government has just mandated that all state agencies have disaster recovery plans that allow the agencies to recover critical applications in acceptable periods of time with no loss of performance. Based on this new business requirement, what is this agency most likely to need?()