A.Voltage
B.Frequency
C.Power Source Loading (max)
D.Power Source Loading (typical)
您可能感兴趣的试卷
你可能感兴趣的试题
A.Ask the customer to confirm which option is best for their environment.
B.Order the fibre channel option and purchase a converter later if necessary.
C.Order both SCSI and fibre channel adapters to cover both potential options.
D.Inform the customer that fibre channel was selected for performance reasons.
A company has recently placed an order for a POWER4+ p650 server.
Their facilities manager has approached the pSeries technical specialist to gather information on the correct power receptacle for thenew server.
They have requested a picture of the power cord plug to show to their electrician.
Where would the pSeries technical specialist find the required information?()
A.Sales Manual
B.Announcement Letter
C.POWER4+ p650 Specification Sheet
D.Site and Hardware Planning Information Manual
A.Add a PCI-X Dual Channel Ultra320 SCSI Adapter (FC 5712).
B.Add a PCI-X Fibre Channel Adapter (FC 5716).
C.Add the optional External SCSI Port Enablement Cable (FC 4273).
D.Use the integrated external SCSI port on the p5-570 Express server.
A.p690 with Dynamic LPAR
B.Grid of SP switch-attached p5-550s
C.p690 with Advanced POWER Virtualization
D.p5-570 with Advanced POWER Virtualization
A customer wants to take advantage of IBM’s Micro-Partitioning capabilities for their new AIX applications.
The pSeries technical specialist should recommend purchasing which of the following?()
A.p5 hardware, AIX 5.2, Virtual I/O Server
B.POWER4 hardware, AIX 5.3, Virtual I/O Server,
C.p5 hardware, AIX 5.3, Advanced POWER Virtualization feature
D.POWER4 hardware, AIX 5.2, Advanced POWER Virtualization feature
A.Decide not to bid.
B.Provide a solution in the bid.
C.Provide a disclaimer in the bid.
D.Discuss options with the customer.
A customer’s new rack contains 12 x p655 servers.
The customer currently has an HMC with one 128-port async adapter with a rack mounted 16-port RAN. The HMC is already attached to two pSeries p630s.
What upgrades, if any, are needed to the HMC to support the new p655 servers?()
A.No upgrades are needed.
B.Add another 16-port RAN.
C.Add an 8-port async adapter.
D.Add an additional 128-port adapter.
A.To revalidate the total solution
B.To overcome objections to the solution
C.To review the pricing with the customer
D.To ensure the customer has the correct applications
A.Optional 4-pack
B.7311-D20 RIO drawer
C.Optional 4-pack and a 7311-D20 RIO drawer
D.Optional 4-pack attached to a PCI SCSI card
The sales team has just sold the first pSeries solution to a Windows NT customer.
The team has identified concerns with a non-existent backup strategy and some workable environmental issues.
In addition to these concerns,what other major concern should be considered?()
A.Customer skill level
B.Hardware availability
C.Lack of executive sponsorship
D.Hardware and software compatibility
最新试题
A customer is experiencing problems with a failed disk drive on their newly purchased p630 server. The IBM CE has replaced the disk and now the mirrored Logical Volume needs to be re-created. The customer does not have the skills to do this. There is no support contract with the solution provider but the p630 is covered under a Software Maintenance Agreement (SWMA) 24/7 contract. What should the pSeries technical specialist do first?()
A customer is planning to migrate a financial application to a 12-way p5-570 system with 96GB of memory. The application data is stored on an ESS Model 800 attached to a p670 server with AIX 5.2. They will have a short outage window to perform the data migration. What is the quickest way to move all the data stored on the attached ESS from the p670 to the new p5-570?()
During a presentation on the p5 machines, a customer asks the pSeries technical specialist a question regarding the differences between POWER4+ and POWER5. In addition to new advanced power management, SMT, and larger L2 and L3 caches in POWER5, which of the following describes some of the key improvements in POWER5?()
A customer needs detailed information on the internal architecture of the new p5-570. Which of the following is the most appropriate place to get this documentation?()
A customer has an 8-way p650 running an application for about 200 users. In the past, the requiredamount of memory and processors has increased proportionally to the number of new users. The customer plans to increase users by 10% each year for the next three years. Next year, a database will be added to the workload to support the users directly rather than being on a separate machine. What is the most likely result of this projected growth?()
A customer is having problems after an AIX version upgrade from 5.2 to 5.3. Which of the following should the pSeries technical specialist recommend that the customer call?()
A customer has several small AIX applications that are expected to grow over the next several years. The biggest challenge facing the customer is determining the growth rate of the applications and the I/T requirements needed to support the growth. They are also concerned about the under-utilization of their IT resources. What should the pSeries technical specialist recommend to address this challenge?()
A customer has an 8-way p5-570 with eight internal disk drives and AIX 5.2. Which of the following must be added, if anything, to the configuration to support four LPARs, assuming each LPAR requires twodisk drives?()
A customer has implemented several IBM AIX systems over the past several years and feels comfortable with their AIX skills. They are planning to implement their first HACMP cluster of two p5-570s. Which of the following should be included in the IBM proposal?()
A customer is adding a new p5 machine to their environment. The machine will host several DB2 partitions running AIX 5.2. They currently have two SAN directors and an IBM ESS. The SAN design allows for concurrent maintenance. What is required on each partition to attach to the SAN?()