A.Micro-Partitioning support and the L3 controller is now between L2 and main memory.
B.Dynamic partitioning support and the L3 controller is now between L2 and main memory.
C.Micro-Partitioning support and the L3 controller is no longer between L2 and main memory.
D.Dynamic partitioning support and the L3 controller is no longer between L2 and main memory.
您可能感兴趣的试卷
你可能感兴趣的试题
A.Create a POWER5 technical presentation for the account executive’s use.
B.Mentor the account executive with the most important POWER5 features and benefits.
C.Attend the meeting instead of the account executive to present the POWER5 features and benefits.
D.Join the meeting via teleconference at a prescheduled time to present the POWER5 features and benefits.
A.The technical support specialist has completed a UNIX course at college.
B.The technical specialist has supported several similar projects and has earned an IBM AIX certification.
C.The technical support specialist’s company sells $3M of UNIX computer systems every year.
D.The technical support specialist has sold and installed at least a dozen Apple and iSeries systems with POWER processors.
A.One 7311-D20 drawer
B.Two 7311-D20 drawers
C.Two 7311-D10 drawers
D.One 7311-D10 drawers
A.Sales Manual
B.Announcement Letter
C.Site and Hardware Planning Information
D.Adapter, Devices, and Cable Information for Multiple Bus Systems
A.7311-D20 drawer with four disks
B.Upgrade to AIX 5.3
C.Fiber adapters to attach to SAN
D.Nothing
A customer is considering multiple options for a particular set of workloads on AIX v5.2.
They need to run ten identical LPARS, each containing four fibre cards, two 2-port Ethernet cards, and one SCSI card as well as two internal boot disks.
They want the LPARS to be split across two physical systems for redundancy purposes; cost is an issue.
They need a total of approximately 40 rPerf for all ten workloads. Which of the following solutions best fits these needs?()
A.2 x p655 1.7ghz 8-way servers (21.87 rPerf each)
B.2 x p670 1.5ghz 8-way servers (24.18 rPerf each)
C.2 x p690 1.7ghz 8-way servers (27.11 rPerf each)
D.2 x p650 1.45ghz 8-way servers (18.67 rPerf each)
A.Voltage
B.Frequency
C.Power Source Loading (max)
D.Power Source Loading (typical)
A.Ask the customer to confirm which option is best for their environment.
B.Order the fibre channel option and purchase a converter later if necessary.
C.Order both SCSI and fibre channel adapters to cover both potential options.
D.Inform the customer that fibre channel was selected for performance reasons.
A company has recently placed an order for a POWER4+ p650 server.
Their facilities manager has approached the pSeries technical specialist to gather information on the correct power receptacle for thenew server.
They have requested a picture of the power cord plug to show to their electrician.
Where would the pSeries technical specialist find the required information?()
A.Sales Manual
B.Announcement Letter
C.POWER4+ p650 Specification Sheet
D.Site and Hardware Planning Information Manual
最新试题
A customer is considering multiple options for a particular set of workloads on AIX v5.2. They need to run ten identical LPARS, each containing four fibre cards, two 2-port Ethernet cards, and one SCSI card as well as two internal boot disks. They want the LPARS to be split across two physical systems for redundancy purposes; cost is an issue. They need a total of approximately 40 rPerf for all ten workloads. Which of the following solutions best fits these needs?()
A customer is adding a new p5 machine to their environment. The machine will host several DB2 partitions running AIX 5.2. They currently have two SAN directors and an IBM ESS. The SAN design allows for concurrent maintenance. What is required on each partition to attach to the SAN?()
A pSeries technical specialist is configuring the network adapters for an HACMP cluster. The plan is to use a four-port Ethernet adapter with IPAT via IP aliasing for the two service IP labels. Which of the following would be a critical concern with the proposed configuration?()
During a presentation on the p5 machines, a customer asks the pSeries technical specialist a question regarding the differences between POWER4+ and POWER5. In addition to new advanced power management, SMT, and larger L2 and L3 caches in POWER5, which of the following describes some of the key improvements in POWER5?()
A customer is planning to migrate a financial application to a 12-way p5-570 system with 96GB of memory. The application data is stored on an ESS Model 800 attached to a p670 server with AIX 5.2. They will have a short outage window to perform the data migration. What is the quickest way to move all the data stored on the attached ESS from the p670 to the new p5-570?()
A customer purchased a p690 32-way but did not purchase additional ServiceSuite offerings. They asked what type of maintenance is standard on the p690. Which of the following is the most appropriate answer?()
A customer needs detailed information on the internal architecture of the new p5-570. Which of the following is the most appropriate place to get this documentation?()
A customer has a large UNIX environment and has engaged a pSeries technical specialist to work on a solution with them. Which of the following statements would best establish UNIX credibility with a knowledgeable customer?()
A state agency has recently deployed a new application on an 8-way p5-570 that is critical to the agency’s operation. There is no manual method to perform the business process. The state government has just mandated that all state agencies have disaster recovery plans that allow the agencies to recover critical applications in acceptable periods of time with no loss of performance. Based on this new business requirement, what is this agency most likely to need?()
A bank is interested in technology that will enhance competitiveness and flexibility in the financial trading market by harnessing the typically unused power of idle machines. The pSeries technical specialist should make the customer aware of which IBM offering?()