A company has recently placed an order for a POWER4+ p650 server.
Their facilities manager has approached the pSeries technical specialist to gather information on the correct power receptacle for thenew server.
They have requested a picture of the power cord plug to show to their electrician.
Where would the pSeries technical specialist find the required information?()
A.Sales Manual
B.Announcement Letter
C.POWER4+ p650 Specification Sheet
D.Site and Hardware Planning Information Manual
您可能感兴趣的试卷
你可能感兴趣的试题
A.Add a PCI-X Dual Channel Ultra320 SCSI Adapter (FC 5712).
B.Add a PCI-X Fibre Channel Adapter (FC 5716).
C.Add the optional External SCSI Port Enablement Cable (FC 4273).
D.Use the integrated external SCSI port on the p5-570 Express server.
A.p690 with Dynamic LPAR
B.Grid of SP switch-attached p5-550s
C.p690 with Advanced POWER Virtualization
D.p5-570 with Advanced POWER Virtualization
A customer wants to take advantage of IBM’s Micro-Partitioning capabilities for their new AIX applications.
The pSeries technical specialist should recommend purchasing which of the following?()
A.p5 hardware, AIX 5.2, Virtual I/O Server
B.POWER4 hardware, AIX 5.3, Virtual I/O Server,
C.p5 hardware, AIX 5.3, Advanced POWER Virtualization feature
D.POWER4 hardware, AIX 5.2, Advanced POWER Virtualization feature
A.Decide not to bid.
B.Provide a solution in the bid.
C.Provide a disclaimer in the bid.
D.Discuss options with the customer.
A customer’s new rack contains 12 x p655 servers.
The customer currently has an HMC with one 128-port async adapter with a rack mounted 16-port RAN. The HMC is already attached to two pSeries p630s.
What upgrades, if any, are needed to the HMC to support the new p655 servers?()
A.No upgrades are needed.
B.Add another 16-port RAN.
C.Add an 8-port async adapter.
D.Add an additional 128-port adapter.
A.To revalidate the total solution
B.To overcome objections to the solution
C.To review the pricing with the customer
D.To ensure the customer has the correct applications
A.Optional 4-pack
B.7311-D20 RIO drawer
C.Optional 4-pack and a 7311-D20 RIO drawer
D.Optional 4-pack attached to a PCI SCSI card
The sales team has just sold the first pSeries solution to a Windows NT customer.
The team has identified concerns with a non-existent backup strategy and some workable environmental issues.
In addition to these concerns,what other major concern should be considered?()
A.Customer skill level
B.Hardware availability
C.Lack of executive sponsorship
D.Hardware and software compatibility
The sales team has brought in the pSeries technical specialist to recommend the best solution to win the business.
The customer wants the lowest purchase cost four-disk solution using an external I/O solution.
Which of the following offerings provides the required base function at the lowest cost?()
A.2104
B.ESS800
C.FAStT600
D.SSA 7133
A.rPerf
B.ROLTP
C.SPECfp
D.SPECint
最新试题
A customer has asked for a p690 system with the following requirements: ? 32 1.9ghz processors ? 128GB of memory ? 20 fiber adapters ? 7 network cards ? 10 LPARs What is the most appropriate question to ask them in order to build the hardware configuration correctly?()
A customer wants a configuration for a new system that includes Reserve CoD. Which of the following systems would be the most appropriate to configure for them?()
A customer is planning to migrate a financial application to a 12-way p5-570 system with 96GB of memory. The application data is stored on an ESS Model 800 attached to a p670 server with AIX 5.2. They will have a short outage window to perform the data migration. What is the quickest way to move all the data stored on the attached ESS from the p670 to the new p5-570?()
A customer has implemented several IBM AIX systems over the past several years and feels comfortable with their AIX skills. They are planning to implement their first HACMP cluster of two p5-570s. Which of the following should be included in the IBM proposal?()
A customer asks the pSeries technical specialist to recommend which remote access (SSH or Telnet) method to use. What question should the customer be asked to best determine the proper recommendation?()
A customer has many RS/6000s and POWER4 systems running different AIX applications. What should the customer do to best position themselves for the migration to POWER5?()
A customer needs a new 4-way p630 with three partitions to support three AIX 5.2 applications. Each partition requires two of the following: OS boot drives, fiber adapters, and gigabit Ethernet adapters. The customer has an HMC with an available serial port. In addition to the model 6C4, which of the following is required to meet the customer’s requirements?()
A customer is considering multiple options for a particular set of workloads on AIX v5.2. They need to run ten identical LPARS, each containing four fibre cards, two 2-port Ethernet cards, and one SCSI card as well as two internal boot disks. They want the LPARS to be split across two physical systems for redundancy purposes; cost is an issue. They need a total of approximately 40 rPerf for all ten workloads. Which of the following solutions best fits these needs?()
A customer purchased a p690 32-way but did not purchase additional ServiceSuite offerings. They asked what type of maintenance is standard on the p690. Which of the following is the most appropriate answer?()
A customer is adding a new p5 machine to their environment. The machine will host several DB2 partitions running AIX 5.2. They currently have two SAN directors and an IBM ESS. The SAN design allows for concurrent maintenance. What is required on each partition to attach to the SAN?()