A.HACMP Hardware Services
B.p5-570 differences update
C.HACMP SmoothStart Services
D.AIX installation education
您可能感兴趣的试卷
你可能感兴趣的试题
A.Use rsync to synchronize the data across servers.
B.Use exportvg and importvg to move the data to the target system.
C.Use NFS to copy the data from the source system to the target system.
D.Backup the data from the source system and restore to the target system.
A.Is there a need for a PKI Management System?
B.Is there a need for end-to-end encryption?
C.Do they currently have a Kerberos domain in place?
D.Which clients are installed on their desktops -- SSH, Telnet or both?
A.IBM sales manual
B.IBM Redbooks Website
C.IBM eServer p5 and pSeries Qs and As
D.IBM eServer p5 and pSeries Facts and Features
A.IBM Grid Toolbox
B.IBM Capacity on Demand
C.IBM Cluster Systems Management
D.IBM Global Solutions Directory
A.IBM p5-570 8-way
B.IBM p5-570 4-way
C.IBM p5-570 2-way
D.IBM p5-570 16-way
A.Micro-Partitioning support and the L3 controller is now between L2 and main memory.
B.Dynamic partitioning support and the L3 controller is now between L2 and main memory.
C.Micro-Partitioning support and the L3 controller is no longer between L2 and main memory.
D.Dynamic partitioning support and the L3 controller is no longer between L2 and main memory.
A.Create a POWER5 technical presentation for the account executive’s use.
B.Mentor the account executive with the most important POWER5 features and benefits.
C.Attend the meeting instead of the account executive to present the POWER5 features and benefits.
D.Join the meeting via teleconference at a prescheduled time to present the POWER5 features and benefits.
A.The technical support specialist has completed a UNIX course at college.
B.The technical specialist has supported several similar projects and has earned an IBM AIX certification.
C.The technical support specialist’s company sells $3M of UNIX computer systems every year.
D.The technical support specialist has sold and installed at least a dozen Apple and iSeries systems with POWER processors.
A.One 7311-D20 drawer
B.Two 7311-D20 drawers
C.Two 7311-D10 drawers
D.One 7311-D10 drawers
最新试题
A customer needs a new 4-way p630 with three partitions to support three AIX 5.2 applications. Each partition requires two of the following: OS boot drives, fiber adapters, and gigabit Ethernet adapters. The customer has an HMC with an available serial port. In addition to the model 6C4, which of the following is required to meet the customer’s requirements?()
A customer has many RS/6000s and POWER4 systems running different AIX applications. What should the customer do to best position themselves for the migration to POWER5?()
A customer has just obtained a second data center through the acquisition of a competitor. The IT Director is now seeking to merge,integrate,and rebalance systems across the two data centers over thenext two years. They have just deployed a high-speed point-to-point circuit between the facilities. The IT Director would like a system that could backup their AIX and Win2K servers and electronically vault the data between sites as part of their Disaster Recovery Plan. What product should the pSeries technical specialist recommend for this requirement?()
A new p5 customer has just installed a partitioned p5-550 alongside some older POWER4 servers. The pSeries technical specialist has received a call to say that the existing HMC (7315) cannot connect to the new server. How can the specialist help the customer?()
A customer asks the pSeries technical specialist to recommend which remote access (SSH or Telnet) method to use. What question should the customer be asked to best determine the proper recommendation?()
A customer has asked for a p690 system with the following requirements: ? 32 1.9ghz processors ? 128GB of memory ? 20 fiber adapters ? 7 network cards ? 10 LPARs What is the most appropriate question to ask them in order to build the hardware configuration correctly?()
A customer is having problems after an AIX version upgrade from 5.2 to 5.3. Which of the following should the pSeries technical specialist recommend that the customer call?()
A customer wants to receive automatic notification of critical software problems and fixes for their RS/6000 or eServer pSeries system. Which is the most appropriate services offering to recommend to them?()
A customer needs detailed information on the internal architecture of the new p5-570. Which of the following is the most appropriate place to get this documentation?()
Due to slow response times, a customer purchased additional memory. After the memory was installed,response time was not improved. They complained to the pSeries technical specialist. Which of the following questions should be asked of this customer?()