The pSeries technical specialist has a number of tasks to perform and does not have time to do them all. It is a week before the end of quarter and the account executives all state that their individual requests are the highest priority. How should the following task list be prioritized? ()
1. Return a call from customer seeking compatibility information.
2. Configure three p690 servers to be ordered in two weeks.
3. Prepare a POWER5 presentation to give to a customer in two weeks.
4. Configure three p690 servers to be ordered this quarter.
A.4,2,1,3
B.4,3,1,2
C.2,4,3,1
D.2,3,4,1
您可能感兴趣的试卷
你可能感兴趣的试题
A.Create a POWER5 technical presentation for the account executive’s use.
B.Mentor the account executive with the most important POWER5 features and benefits.
C.Attend the meeting instead of the account executive to present the POWER5 features and benefits.
D.Join the meeting via teleconference at a prescheduled time to present the POWER5 features and benefits.
A.The technical support specialist has completed a UNIX course at college.
B.The technical specialist has supported several similar projects and has earned an IBM AIX certification.
C.The technical support specialist’s company sells $3M of UNIX computer systems every year.
D.The technical support specialist has sold and installed at least a dozen Apple and iSeries systems with POWER processors.
A.One 7311-D20 drawer
B.Two 7311-D20 drawers
C.Two 7311-D10 drawers
D.One 7311-D10 drawers
A.Sales Manual
B.Announcement Letter
C.Site and Hardware Planning Information
D.Adapter, Devices, and Cable Information for Multiple Bus Systems
A.7311-D20 drawer with four disks
B.Upgrade to AIX 5.3
C.Fiber adapters to attach to SAN
D.Nothing
A customer is considering multiple options for a particular set of workloads on AIX v5.2.
They need to run ten identical LPARS, each containing four fibre cards, two 2-port Ethernet cards, and one SCSI card as well as two internal boot disks.
They want the LPARS to be split across two physical systems for redundancy purposes; cost is an issue.
They need a total of approximately 40 rPerf for all ten workloads. Which of the following solutions best fits these needs?()
A.2 x p655 1.7ghz 8-way servers (21.87 rPerf each)
B.2 x p670 1.5ghz 8-way servers (24.18 rPerf each)
C.2 x p690 1.7ghz 8-way servers (27.11 rPerf each)
D.2 x p650 1.45ghz 8-way servers (18.67 rPerf each)
A.Voltage
B.Frequency
C.Power Source Loading (max)
D.Power Source Loading (typical)
A.Ask the customer to confirm which option is best for their environment.
B.Order the fibre channel option and purchase a converter later if necessary.
C.Order both SCSI and fibre channel adapters to cover both potential options.
D.Inform the customer that fibre channel was selected for performance reasons.
A company has recently placed an order for a POWER4+ p650 server.
Their facilities manager has approached the pSeries technical specialist to gather information on the correct power receptacle for thenew server.
They have requested a picture of the power cord plug to show to their electrician.
Where would the pSeries technical specialist find the required information?()
A.Sales Manual
B.Announcement Letter
C.POWER4+ p650 Specification Sheet
D.Site and Hardware Planning Information Manual
A.Add a PCI-X Dual Channel Ultra320 SCSI Adapter (FC 5712).
B.Add a PCI-X Fibre Channel Adapter (FC 5716).
C.Add the optional External SCSI Port Enablement Cable (FC 4273).
D.Use the integrated external SCSI port on the p5-570 Express server.
最新试题
Due to slow response times, a customer purchased additional memory. After the memory was installed,response time was not improved. They complained to the pSeries technical specialist. Which of the following questions should be asked of this customer?()
A customer asks the pSeries technical specialist to recommend which remote access (SSH or Telnet) method to use. What question should the customer be asked to best determine the proper recommendation?()
A bank is interested in technology that will enhance competitiveness and flexibility in the financial trading market by harnessing the typically unused power of idle machines. The pSeries technical specialist should make the customer aware of which IBM offering?()
A customer is ordering a new p650 server to be placed into an existing OEM 42U 19-inch rack containing only two p630 servers. This is the first p650 in the enterprise. What is the most important question that the pSeries technical specialist should ask the customer before the order is placed?()
A customer has defined their server needs as a four-LPAR 16-way p570 with 64GB of memory, four 10/100/1000 TX LAN adapters, and six fibre channel adapters to external storage in an IBM ESS (Shark). They like the idea of being able to do SAN maintenance while not incurring downtime. If all LPARs are production related and similar, which question is most appropriate for the pSeries technical specialist to ask?()
A customer has several small AIX applications that are expected to grow over the next several years. The biggest challenge facing the customer is determining the growth rate of the applications and the I/T requirements needed to support the growth. They are also concerned about the under-utilization of their IT resources. What should the pSeries technical specialist recommend to address this challenge?()
The pSeries technical specialist has a number of tasks to perform and does not have time to do them all. It is a week before the end of quarter and the account executives all state that their individual requests are the highest priority. How should the following task list be prioritized? ()1. Return a call from customer seeking compatibility information. 2. Configure three p690 servers to be ordered in two weeks. 3. Prepare a POWER5 presentation to give to a customer in two weeks. 4. Configure three p690 servers to be ordered this quarter.
A customer is adding a new p5 machine to their environment. The machine will host several DB2 partitions running AIX 5.2. They currently have two SAN directors and an IBM ESS. The SAN design allows for concurrent maintenance. What is required on each partition to attach to the SAN?()
A customer needs both a database and application server to communicate over a network. The new systems will be connected to the same network as the current IBM equipment with known IBM serial numbers. How could a pSeries technical specialist best determine which type of network card is appropriate, without making an additional call to the customer?()
A pSeries technical specialist is configuring the network adapters for an HACMP cluster. The plan is to use a four-port Ethernet adapter with IPAT via IP aliasing for the two service IP labels. Which of the following would be a critical concern with the proposed configuration?()