The sales team has just sold the first pSeries solution to a Windows NT customer.
The team has identified concerns with a non-existent backup strategy and some workable environmental issues.
In addition to these concerns,what other major concern should be considered?()
A.Customer skill level
B.Hardware availability
C.Lack of executive sponsorship
D.Hardware and software compatibility
您可能感兴趣的试卷
你可能感兴趣的试题
The sales team has brought in the pSeries technical specialist to recommend the best solution to win the business.
The customer wants the lowest purchase cost four-disk solution using an external I/O solution.
Which of the following offerings provides the required base function at the lowest cost?()
A.2104
B.ESS800
C.FAStT600
D.SSA 7133
A.rPerf
B.ROLTP
C.SPECfp
D.SPECint
A.Running AIX 5.3 Implementing HACMP Implementing Static LPAR
B.Implementing Advanced POWER Virtualization Running Linux Attaching RIO drawers
C.Implementing VIO Server Implementing Dynamic LPAR Running with SMT turned "On"
D.Running AIX and Linux on the same system Implementing CoD Implementing Micro-Partitioning
A.p630 2-way Active 2-way Inactive
B.p655 2-way Active 2-way Inactive
C.p5-520 2-way Active 2-way Inactive
D.p5-550 2-way Active 2-way Inactive
A.Are there at least ten RS-232 ports available on the HMC?
B.Are there at least ten RS-422 ports available on the HMC?
C.Are there at least ten RS-232 and two RS-422 ports available on the HMC?
D.Are there at least two RS-232 and ten RS-422 ports available on the HMC?
A.Implementing CoD
B.Using Express Configurations with processor upgrades
C.Meeting the minimum Value Pak rules
D.Engaging the pSeries representative to identify appropriate discounts
A.MRPDPlus tool
B.Inventory Services
C.PCRS6000 Portable Configurator
D.eConfig - IBM Configurator for e-Business
Upon announcement,the specific details surrounding the Virtual I/O Server requirements and performance are still being defined.
The customer has engaged IBM to provide a server consolidation solution and would like to take advantage of the VIO Server benefits.
How should the pSeries technical specialist best address this?()
A.Design the solution and present it confidently so the customer does not question it.
B.Design the solution and ensure the customer understands the unknowns with the new technology.
C.Explain to the customer that the VIO Server does not benefit them when doing server consolidation so it has not been configured.
D.Explain to the customer that the details surrounding the VIO Server have not been clearly defined so designing a solution is premature.
A.Workload Manager,POWER5 support
B.64-bit kernel support,JFS2 support
C.Dynamic LPAR,Capacity upgrade on demand
D.Micro-Partitioning,Virtual I/O Server
最新试题
The pSeries technical specialist has a number of tasks to perform and does not have time to do them all. It is a week before the end of quarter and the account executives all state that their individual requests are the highest priority. How should the following task list be prioritized? ()1. Return a call from customer seeking compatibility information. 2. Configure three p690 servers to be ordered in two weeks. 3. Prepare a POWER5 presentation to give to a customer in two weeks. 4. Configure three p690 servers to be ordered this quarter.
A customer wants to upgrade an existing pSeries system. In addition to retrieving the IBM configuration records, what else should be done to ensure an accurate upgrade quote is provided?()
A customer has implemented several IBM AIX systems over the past several years and feels comfortable with their AIX skills. They are planning to implement their first HACMP cluster of two p5-570s. Which of the following should be included in the IBM proposal?()
During a presentation on the p5 machines, a customer asks the pSeries technical specialist a question regarding the differences between POWER4+ and POWER5. In addition to new advanced power management, SMT, and larger L2 and L3 caches in POWER5, which of the following describes some of the key improvements in POWER5?()
A customer is evaluating an IBM commercial solution against a 16-way rx8620 Integrity (Itanium). The pSeries technical specialist should lead with which of the following IBM systems?()
A customer has asked for a p690 system with the following requirements: ? 32 1.9ghz processors ? 128GB of memory ? 20 fiber adapters ? 7 network cards ? 10 LPARs What is the most appropriate question to ask them in order to build the hardware configuration correctly?()
A customer is getting ready to install a new pSeries system into their data center. They are concerned about providing the appropriate clearance around their 7014-T42 to allow for maintenance. What reference material should the pSeries technical specialist provide to the customer?()
A customer wants a configuration for a new system that includes Reserve CoD. Which of the following systems would be the most appropriate to configure for them?()
A customer is having problems after an AIX version upgrade from 5.2 to 5.3. Which of the following should the pSeries technical specialist recommend that the customer call?()
A customer has several small AIX applications that are expected to grow over the next several years. The biggest challenge facing the customer is determining the growth rate of the applications and the I/T requirements needed to support the growth. They are also concerned about the under-utilization of their IT resources. What should the pSeries technical specialist recommend to address this challenge?()