A.超过
B.超出
C.卸货
D.超载
您可能感兴趣的试卷
你可能感兴趣的试题
A.重吊杆
B.吊杆
C.桅杆
D.桅梯
A.起货机平台
B.夹板
C.千斤顶
D.油压千斤顶
A.油泵
B.油轮
C.油压千斤顶
D.油柜
A.保险销
B.保险锁
C.保险绳
D.保险柜
A.危险的
B.易燃地
C.化学品的
D.有毒的
A.工头
B.码头工人
C.装卸工人
D.领班
A. HANDLE WITH CARE
B. CAUTION AGAINST WET
C. KEEP UPRIGHT
D. NO DUMPING
A. the load
B. safe working load
C. safe working
D. safe loading work
A. low-speed control
B. inching control
C. high-speed control
D. slow-speed control
A. dangerous cargo
B. flammable cargo
C. light cargo
D. heavy cargo
最新试题
The parts of the derrick are: derrick boom rest, gooseneck, center guy, stay, topping lift, topping lift block and so on.()
Clamps have been used up, and we also need plenty of lashing wires.()
There is something wrong with the winch at hatch No.2.()
NO HOOK()
NO TURNING OVER()
Liquid bulk cargo is loaded and discharged by pumps.()
Those lashing tools must be tightened again before and after bad weather.()
NO DUMPING()
I’ll ask the electrician to repair the winch. ()
The SWL of the derricks are different from 5 tons to 10 tons.()