A.double bottom fuel oil tank temperature
B.heater supply steam flow
C.pressure of the fuel supplied to the burners
D.attemperator steam flow in the heater discharge circuit
您可能感兴趣的试卷
你可能感兴趣的试题
A.have no plating joints of 90
B.retain the lube oil as long as possible before it recirculates through the system
C.provided drain/return lines that are no greater than 24 inches from the pump suction
D.be provided with only a perfectly horizontal bottom
A.cause an alarm condition
B.secure power to the indicator
C.secure power to the monitored device
D.automatically recluse within 10 seconds
A.Fuel oil service pump discharge
B.Fuel oil strainer
C.Fuel oil heater
D.Fuel oil flow meter
A.maintain even distribution of bearing wear
B.maintain a constant oil temperature
C.maintain a pressurized film between moving surfaces
D.remove entrained water
A.so as to never be integral lube
B.with a sloped bottom
C.only of nonferrous, noncorrosive metals
D.with drain/return lines terminating just above or at the designed normal level
A.is an indication of the amount of noncombustible material present in the oil
B.indicates the quantity of energy released by burning a unit amount of the fuel
C.is useful for determining proper atomization temperatures
D.reflects the overall thermal efficiency of the fuel oil service system
A.point of opening
B.speed of opening
C.lift from its seat
D.all of the above
A.Steel brush
B.Fine emery cloth or steel wool
C.A section of the removed compression ring
D.A case hardened scraper
A.improper adjustments
B.contaminated fuel
C.coated fuel lines
D.excessive vibration
A.during low loads
B.after proper oil viscosity is reached
C.during starting
D.after cleaning filters
最新试题
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
The ISPS Code consists of a mandatory section-Part A, which shows()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
One of the reasons that cause oil flowed from sludge outlet of a self-cleaning separator is()
The treatment of the fuel oils involves storage, heating, filtering and()
The main purpose of port State control is not to()
() is not installed on the main switchboar.