单项选择题ThefreshwatergeneratoroperateswithavacuumofAllowingthebrinetoevaporateatatemperatureof40-50()

A、60%-70%
B、40%-50%
C、90%-95%
D、20%-30%


您可能感兴趣的试卷

你可能感兴趣的试题

1.单项选择题Thefeed-watertobedistilledinthefreshwatergeneratoristakenfrom()

A、thefreshwatercoolingsystem
B、theseacoolingwaterinletofthecondenser
C、theseacoolingwateroutletofthecondenser
D、theevaporator

2.单项选择题Distilledwaterfromanevaporatormaybedischargedintoapotablewatertank()

A、throughadetachablehoseconnectionactivated
B、afterpassingthroughanactivatedcharcoalfilter
C、afterchemicalanalysisconsumptionshowsitisfitfor
D、throughasolenoidoperatedthree-wayvalve

3.单项选择题Thefunctionofmachineistoosynchronouscompensating()

A、improvepowerfactor
B、reducevoltageoscillationcircuits
C、Increasetheinsulationofmagneticfields
D、eliminateregenerated

4.单项选择题Whenaflash-typeevaporatoristobesecuredforanextendedperiodoftime,theentireunitshouldbedrainedcleaned,and()

A、completelyfilledwith
B、filledwithde-scalingcompound
C、artightlyclosedtoexclude
D、ventedtotheatmosphere

6.单项选择题Whichcharacteristicorconditionwillhavethegreatestoil'sviscosityeffectonincreasinghydraulic()

A、Pourpoint
B、Cloudpoint
C、Vacuum
D、Pressure

7.单项选择题Inanelectro-hydraulicsteeringsystem,ruddershockislimitedbyo()

A、adifferentialgear
B、returnsprings
C、ahydraulicaccumulator
D、reliefvalves

8.单项选择题isprovidedforeachgeneratorwithselectorswitchtoeedcurrentineachphase()

A、Avoltmeter
B、Afrequencymeter
C、Anammeter
D、Asynchroscope

10.单项选择题某水利水电施工企业负责某水库的围堰施工项目,关于该企业在项目建设过程中的安全设施,下列说法中错误的是()。

A、应和主体工程同时设计
B、应和主体工程同时施工
C、应和主体工程同时投入生产和使用
D、应主体工程同时完工