Your customer wants to make sure that there are not going to be compatibility issues between a third party HBA connecting to their non-IBM Storage device.
What IBM resource would you start with to determine compatibility?()
A.IBM Sizing Guides
B.IBM Configuration & Options Guide (COG)
C.IBM Standalone Solutions Configuration Tool (SSCT)
D.IBM ServerProven
您可能感兴趣的试卷
你可能感兴趣的试题
A.IBM Standalone Solutions Configuration Tool (SSCT)
B.IBM System x Sales Configuration Aid (xSCA)
C.IBM Sizing Guides
D.IBM Configuration & Options Guide - (COG)
Your best customer calls in with a last-minute need for the BTU/HR or the heat output per server, per hour for a rack of x3650 servers.
What IBM tool will you use to get your answer quickly?()
A.System x Sales Configuration Aid (xSCA)
B.BladeCenter & System x Power Configurator
C.Configuration & Options Guide - (COG)
D.IBM Sizing Guides
A.IBM Sizing Guides
B.Configuration & Options Guide - (COG)
C.Standalone Solutions Configuration Tool (SSCT)
D.System x Sales Configuration Aid (xSCA)
E.ServerProven
A.IBM System x and BladeCenter Competitive Sales Tool
B.Linux Cluster Sales Assistant - (LCSA)
C.Configuration & Options Guide - (COG)
D.Standalone Solutions Configuration Tool (SSCT)
A.System x Sales Configuration Aid (xSCA)
B.Standalone Solutions Configuration Tool (SSCT)
C.Configuration & Options Guide - (COG)
D.ServerProven
A.ServerProven
B.System x Sales Configuration Aid (xSCA)
C.Configuration & Options Guide - (COG)
D.Standalone Solutions Configuration Tool (SSCT)
A.System x Sales Configuration Aid (xSCA)
B.Standalone Solutions Configuration Tool (SSCT)
C.Linux Cluster Paper Configurator - (LCPC)
D.Linux Cluster Sales Assistant - (LCSA)
A customer wants to boot from an iSCSI SAN with their IBM BladeCenter infrastructure running Microsoft Windows Server 2000.
What is required for the customer to be able to perform this?()
A.Fibre Channel Expansion Card for each Blade Server
B.cKVM Card for each Blade Server
C.iSCSI Expansion Card for each Blade Server
D.4Gb Modular Flash Drive
A customer wants to boot from SAN with their IBM BladeCenter infrastructure.
What is required for the customer to be able to perform this? ()
A.4GB Modular Flash Drive for each Blade Server and Dual 15.8GB 2.5 Solid State Drive for each Blade Server
B.Cisco Intelligent Gb Ethernet Switch Module and IBM BladeCenter Copper Pass-thru Module
C.Fibre Channel Expansion Card for each Blade Server and Fibre Channel SAN Switch Module
D.Cisco Intelligent Gb Ethernet Switch Module and Dual 15.8GB 2.5 Solid State Drive for each Blade Server
Industry standard single 1U, 2U or 3U/4U Intel, AMD, or POWER servers respectively require 600 to 1300 Watt power supplies.
What size power supplies is used by the IBM BladeCenter H to power up to fourteen servers, media components, and network switch modules? ()
A.1400 Watt
B.3200 Watt
C.2900 Watt
D.2000 Watt
最新试题
Which IBM Resource would best help you determine the proper performance tuning of your System x hardware and the application workload of the software?()
What IBM resource will give you a picture of the possible plug types clearly labeled for those times your customer asks, "What plug type do I tell my electrician to use, and what does it look like? ()
A customer is asking for System x server quote. The customer provided IBM with a complete specification except for the backup device. What should a sales specialist do to position a total solution for the customer?()
A customer has received a quotation from Dell for Intel-based 1U servers. What is the first step in submitting your quotation? ()
What IBM resource helps to easily identify a business application that has been validated on IBM Systems?()NOTE: Solutions that are in this resource represent applications that enable IBM Systems and verify, through customer experience, installing and running in a customer location.
A CIO contacts you for an RFP response for an Intel-based opportunity a day before its due date. Your competitor is HP, and you have limited time to complete the RFP. Your technical product specialist is working on another project. What is the best source of information to position IBM against HP? ()
You are speaking to an IT manager with 350 small servers. The IT manager is looking to reduce and consolidate systems. What strategy would you follow?()
A customer requests a solution that will enhance the availability of their servers and ensure that the time needed to recover from an Operating System fault is at a minimum. What solution do you recommend? ()
In an 8-socket x3950 server, with disks on both nodes, how many ServeRAID 8 adapters are needed to implement RAID? All disks must be used.()
A major account is considering migrating from a proprietary Unix server to a Linux and Intel-based platform. They are not sure if the Intel-based server will be able to handle the workload of the Unix server. What would be the best strategy to win with an IBM solution?()