A solution for two batch applications was proposed in Companycom meeting. They are currently running in two LPARs on a p690. On a daily basis, both applications use 15% of the machine for their workload, and increase to 100% when their weekly reports are run.
Since the reports are not run on the same day, what is the best solution?()
A.COD
B.DLPAR
C.One big LPAR
D.Two separate p690 machines
您可能感兴趣的试卷
你可能感兴趣的试题
A.Use savevg and copy to an NFS filesystem
B.Create a mksysb on an NFS exported filesystem
C.Use tar to copy system over network with a pipe
D.Create mksysb on an NFS exported NIM filesystem
Companycom is planning a p5 595 running AIX 5L 5.3 LPARs. They would like to design the system using physical resources with maximum resource efficiency. One LPAR requires a peak load of 30 processors during the week with a low of 1 processor required on the weekend. The other LPAR requires only a single processor most of the time, but needs at least 24 processors at the beginning of the weekend to finish its weekly processing in the window allocated.
Which of the following solutions is most appropriate to continuously maximize resource use for these two LPARs?()
A.Dynamic LPAR
B.Workload Manager
C.Partition Load Manager
D.Shared Processor Pools
An administrator has set up three partitions using a shared processor pool with 2 processors and SMT turned on. The partitions are activated in the following sequence: Partition one: Min = 0.5, max = 3.0, desired = 1.0; Partition two: Min = 1.0, max = 3.0, desired = 1.5 Partition three: Min = 1, max = 0.5, desired = 2.
What is the outcome?()
A.Partition one starts and has 3.0 logical processors. Partition two does not start. Partition three has 1.0 logical processors.
B.Partition one starts and has 1.5 logical processors. Partition two has 1.0 logical processors. Partition three has 0.1 processors.
C.Partition one starts and has 2.0 logical processors. Partition two start and has 2.0 logical processors. Partition three does not start.
D.Partition one starts and has 2.0 logical processors. Partition two has 1.0 logical processors. Partition three has 0.1 logical processors.
A.logform
B.savebase
C.exportvg
D.synclvodm
Companycom wants to buy a new p5 570 running AIX 5.3. The applications require 4 processors and 8GB of memory. There is a requirement to have a Virtual IO Server.
What is the smallest p5 570 that should be sold to this customer?()
A.4 processors 8GB of memory
B.5 processors 8GB of memory
C.4 processors 10GB of memory
D.5 processors 10GB of memory
A.abc123
B.hscroot
C.passw0rd
D.password
A.By typing diags and then going to the ASMI menus
B.Through SSH from a TCP/IP connection on the server
C.Through WebSM which is connected to a system Ethernet port
D.By connecting through a web browser to an HMC Ethernet port
A system administrator for a business recovery service center needs to test disaster recovery strategies for their clients running Linux. Each client has a different system configuration. Each time a client comes in, the system configuration of the managed system must change.
What is the best way to handle this using LPAR?()
A.Create a system profile. Reconfigure the managed system by activating and deactivating the system profiles.
B.Create one partition profile for each client. Reconfigure the managed system by activating the partition profiles for that client.
C.Dynamically move processors and memory as needed into each logical partition. Reconfigure the managed system by activating and deactivating partition profiles.
D.Dynamically move processors and memory into each logical partition on the server if additional resources are needed. Reconfigure the managed system by activating and deactivating the system profiles.
SuSe Linux Enterprise Server (SLES) has been installed on an LPAR on a p5 570, but the client is having problems directly after installation with slow network performance.
What is the most probable cause?()
A.SLES does not perform well with DHCP
B.SLES was installed with the default host name of Linux
C.Virtual Network Resources are being used, which is not supported in a SLES environment
D.The SLES instance was installed in 32-bit mode, where 64-bit should have been selected
Companycom is converting an application over to a p5 595 server with LPARs and has underestimated the processor requirements. The system has COD processors, but the customer does not know how to size the workload.
What course of action would help identify the processor requirement?()
A.Activate the Trial COD for the processors and run a test to verify outcome
B.Activate the On/Off COD for the processors and run a test to verify outcome
C.Use rmss to simulate the processor workload and run a test to verify outcome
D.Use rmps to simulate the processor workload and run a test to verify outcome
最新试题
Companycom has plans to deploy a large database solution. Their primary requirement is minimal user access downtime. They are comparing a single server implementation with a two server deployment.What solution would they use to avoid downtime for OS software maintenance?()
A client has the need to reboot one of their Virtual IO Servers. What command(s) would be run to list the clients that are dependant on Virtual IO Server disk and network resources?()
Companycom is purchasing a 64-way p5 595. They have determined the location for the server is in a datacenter which does not have a raised floor.Which of the following would best meet the server requirements?()
Companycom has seven days of vmstat data on a p5 590. The server has a total of four test/dev LPARs and 4 production LPARs of one processor each. On the four test/dev LPARs, the data shows 90-95% peak utilizations with a duration of from 5 to 10 minutes. The average utilizations of all LPARs were between 15-30%. All of the applications have different times when they peak. What is the best configuration to fully utilize the processor resource?()
System configurations on the HMC have been backed up correctly. After a restore, the partitions are defined with different characteristics than the running systems.What is the most probable cause of this problem?()
How can dedicated processors be differentiated from virtual processors from a physical processor viewpoint?()
A client will be creating partitions on multiple systems with identical configurations. What is the recommended method for cloning the master partition?()
Companycom has a requirement for an LPAR in their p5 595 to run SUSE Linux. They also require an adapter that is not currently supported in Linux.Which of the following would be the best solution to recommend?()
The System Administrator has set up shared processors on three partitions in the p5 590 system. The shared processors have been set to uncapped. The system administrator notices that the logical partition is acting like it is capped.What is the most probable cause?()
One of the mirrored disks for the root volume group has failed. Although the logical volumes are mirrored, and the bosboot command was run, the machine will not boot.What is the most probable cause?()