System configurations on the HMC have been backed up correctly. After a restore, the partitions are defined with different characteristics than the running systems.
What is the most probable cause of this problem?()
A.The LPAR Configuration backup is corrupt
B.The LPAR Configuration has been altered using DLPAR
C.The LPAR Configuration backup was performed on a different HMC
D.The LPAR Configuration has been altered through the Advanced System Management Interface (ASMI) on the server after the backup was performed
您可能感兴趣的试卷
你可能感兴趣的试题
The System Administrator has set up shared processors on three partitions in the p5 590 system. The shared processors have been set to uncapped. The system administrator notices that the logical partition is acting like it is capped.
What is the most probable cause?()
A.The uncapped weight has been set to 0.
B.The uncapped weight has been set to 128.
C.The processing unit for that partition was set to .1 processing units. A full processor was assigned.
D.The processing unit for that partition was set to 0.50 processing units. A full processor was assigned.
A.lsmap -all -net
B.lsclient -disk -net
C.lsdev -virtual -client
D.lsmap -all; lsmap -net
Companycom is moving their application to a p5 590 and at the same time moving to a new version of the application. The customer knows only about the resource requirements of the old version.
Which of the following is the best method to migrate their application to POWER5?()
A.Add CPU and memory COD so they have room to grow if required
B.Make the server configuration twice as large as the current requirement
C.Configure the server for the current capacity requirements
D.Make the server configuration a little larger than the current capacity requirements
Companycom recently ordered a p5 570 and an HMC. Prior to delivery, two additional p5 570 servers were added to the order. Upon installation, the system administrator noticed that they do not have a method to connect the p5 570 servers to the HMC.
Which of the following will allow them to connect all servers to the HMC?()
A.An 8-port adapter to the HMC
B.A hub for the private network
C.An additional Ethernet card to the HMC
D.An additional Ethernet card for each partition
Companycom is migrating from a p690 to a p5 595 utilizing APV Virtual IO features. They have created their profiles for their two Virtual IO Servers. The first Virtual IO Server is installed and running. When trying to DLPAR the DVD/ROM the task fails on the HMC.
What is the probable cause?()
A.APV key is not registered
B.Networking and DNS are not configured
C./etc/hosts table on HMC is not configured
D.Virtual IO Server dose not support DLPAR
A.vmo to adjust the maxperm value
B.schedo to adjust the mempool size
C.ioo to modify the maxpgahead value
D.bosboot to reassign the memory cache size
A.A SAN device
B.First I/O drawer
C.Any I/O drawer within the main frame
D.First I/O drawer within the expansion frame
Companycom is buying an application solution that bases its software licensing on the number of CPUs per machine. They will be running two instances of this application and will require 8 CPUs each. A second application is priced based on CPUs per LPAR as well as the class of machine. That application will require 8 CPUs.
What is the best hardware to propose to keep the software cost low?()
A.A 24 way p5 595 with 3 LPARs
B.A 24 way p5 595 with 2 LPARs
C.One p5 570s 16 way and one p5 570 8 way
D.One p5 595 12 way active and 12 way inactive, and one p5 570 8 way
A.Restart the rsct and inetd daemons
B.Customize the node setting in /etc/services
C.Rename the rootvg filesystems to their original names
D.Customize the node_id file and restart the rsct daemons
Companycom has a Linux LPAR on a p5 570 server. The 3rd party storage subsystem devices are not supported by Linux.
How would access be provided to the storage subsystem devices for this Linux LPAR?()
A.Daisy chain the unsupported 3rd party storage subsystem devices with the local SCSI disk drive
B.Assuming the 3rd party storage subsystem has AIX support, enable access through a Virtual IO Server
C.Assuming the 3rd party storage subsystem has AIX support, implement the Linux partition within an AIX partition
D.3rd party storage is not an option for p5 570 servers and therefore only IBM disk subsystems can be considered as a solution
最新试题
Companycom is migrating from a p690 to a p5 595 utilizing APV Virtual IO features. They have created their profiles for their two Virtual IO Servers. The first Virtual IO Server is installed and running. When trying to DLPAR the DVD/ROM the task fails on the HMC.What is the probable cause?()
In addition to the partition profile backup, how should the HMC be backed up to provide bare-metal restore capabilities?()
If using alt_disk_install to install AIX on new LPARs, which of the following will be necessary after booting the new AIX image?()
The System Administrator has set up shared processors on three partitions in the p5 590 system. The shared processors have been set to uncapped. The system administrator notices that the logical partition is acting like it is capped.What is the most probable cause?()
Companycom has a requirement for an LPAR in their p5 595 to run SUSE Linux. They also require an adapter that is not currently supported in Linux.Which of the following would be the best solution to recommend?()
Companycom is moving their application to a p5 590 and at the same time moving to a new version of the application. The customer knows only about the resource requirements of the old version.Which of the following is the best method to migrate their application to POWER5?()
A client will be creating partitions on multiple systems with identical configurations. What is the recommended method for cloning the master partition?()
A company wants to buy memory efficiently on their p5 590 to allow for the best performance. What is the best practice for adding memory for performance?()
A database application is installed on a server. The AIX default filesystem cache is not being re-used by the database. Which of the following should be used to fix this problem?()
Companycom has several AS/400 servers in their IT infrastructure running V5R2 that they wish to consolidate. The customer wants to simplify their environment and install i5/OS on a p5 590 with 16 1.65GHz processors and 20 i5/OS partitions. The customer plans to use the Advanced Power Virtualization to share their storage, processors, and memory.What considerations and limitations should be reviewed with the customer before the purchase?()