Companycom is moving their application to a p5 590 and at the same time moving to a new version of the application. The customer knows only about the resource requirements of the old version.
Which of the following is the best method to migrate their application to POWER5?()
A.Add CPU and memory COD so they have room to grow if required
B.Make the server configuration twice as large as the current requirement
C.Configure the server for the current capacity requirements
D.Make the server configuration a little larger than the current capacity requirements
您可能感兴趣的试卷
你可能感兴趣的试题
Companycom recently ordered a p5 570 and an HMC. Prior to delivery, two additional p5 570 servers were added to the order. Upon installation, the system administrator noticed that they do not have a method to connect the p5 570 servers to the HMC.
Which of the following will allow them to connect all servers to the HMC?()
A.An 8-port adapter to the HMC
B.A hub for the private network
C.An additional Ethernet card to the HMC
D.An additional Ethernet card for each partition
Companycom is migrating from a p690 to a p5 595 utilizing APV Virtual IO features. They have created their profiles for their two Virtual IO Servers. The first Virtual IO Server is installed and running. When trying to DLPAR the DVD/ROM the task fails on the HMC.
What is the probable cause?()
A.APV key is not registered
B.Networking and DNS are not configured
C./etc/hosts table on HMC is not configured
D.Virtual IO Server dose not support DLPAR
A.vmo to adjust the maxperm value
B.schedo to adjust the mempool size
C.ioo to modify the maxpgahead value
D.bosboot to reassign the memory cache size
A.A SAN device
B.First I/O drawer
C.Any I/O drawer within the main frame
D.First I/O drawer within the expansion frame
Companycom is buying an application solution that bases its software licensing on the number of CPUs per machine. They will be running two instances of this application and will require 8 CPUs each. A second application is priced based on CPUs per LPAR as well as the class of machine. That application will require 8 CPUs.
What is the best hardware to propose to keep the software cost low?()
A.A 24 way p5 595 with 3 LPARs
B.A 24 way p5 595 with 2 LPARs
C.One p5 570s 16 way and one p5 570 8 way
D.One p5 595 12 way active and 12 way inactive, and one p5 570 8 way
A.Restart the rsct and inetd daemons
B.Customize the node setting in /etc/services
C.Rename the rootvg filesystems to their original names
D.Customize the node_id file and restart the rsct daemons
Companycom has a Linux LPAR on a p5 570 server. The 3rd party storage subsystem devices are not supported by Linux.
How would access be provided to the storage subsystem devices for this Linux LPAR?()
A.Daisy chain the unsupported 3rd party storage subsystem devices with the local SCSI disk drive
B.Assuming the 3rd party storage subsystem has AIX support, enable access through a Virtual IO Server
C.Assuming the 3rd party storage subsystem has AIX support, implement the Linux partition within an AIX partition
D.3rd party storage is not an option for p5 570 servers and therefore only IBM disk subsystems can be considered as a solution
A.multiple partitions that share the processing power of a set of physical processors where a partition can be assigned as little as 1/2 of a physical processor's resource.
B.multiple partitions that share the processing power of a set of physical processors where a partition can be assigned as little as 1/100th of a physical processor's resource.
C.an advanced virtualization feature of POWER5 systems with Linux (SUSE and Red Hat for POWER) and AIX 5L Version 5.3 that allows multiple partitions to share the processing power of a set of physical processors.
D.an advanced virtualization feature of POWER5 systems with Linux (SUSE and Red Hat for POWER) and AIX 5L Version 5.2 or 5.3 that allows multiple partitions to share the processing power of a set of physical processors.
A.Dedicated and never Virtual processors are used in Virtual IO Servers partitions
B.Dedicated processors are whole processors that are assigned to a single partition
C.Dedicated processors are fractions of whole processors that are dedicated to a single partition
D.Dedicated and Virtual processors are interchangeable concepts, both are whole physical processors used in virtual and dedicated LPARs
A p5 570 12 way was purchased with the plan to install six LPARs running AIX 5.2. The machine has 12 disks spread evenly over the internal server drawers. The customer would now like to add a seventh LPAR.
Which of the following should be added for the seventh LPAR boot device?()
A.An additional 7311-D10 drawer
B.An adapter to boot off a SAN device
C.An additional disk to the media bay
D.Two disks to the internal configuration
最新试题
Companycom is using shared processor LPARs exclusively, including the Virtual IO Server. The users are complaining about response time. The application LPARs can be heavy processor users. The Virtual IO Server has been measured to be processor constrained.How should the Virtual IO Server's shared processor LPAR be configured?()
Companycom has a Linux LPAR on a p5 570 server. The 3rd party storage subsystem devices are not supported by Linux.How would access be provided to the storage subsystem devices for this Linux LPAR?()
Companycom has several AS/400 servers in their IT infrastructure running V5R2 that they wish to consolidate. The customer wants to simplify their environment and install i5/OS on a p5 590 with 16 1.65GHz processors and 20 i5/OS partitions. The customer plans to use the Advanced Power Virtualization to share their storage, processors, and memory.What considerations and limitations should be reviewed with the customer before the purchase?()
Companycom is purchasing a 64-way p5 595. They have determined the location for the server is in a datacenter which does not have a raised floor.Which of the following would best meet the server requirements?()
Companycom is installing a p5 590 with a HMC to manage LPARs. The customer is very concerned about security and wants to restrict network traffic that is not necessary.What is necessary for communication between the LPARs and the HMC?()
What is a primary differentiator between pSeries eWLM (Enterprise Workload Manager) and WLM (Workload Manager)?()
Companycom has purchased a p5 590 with 16 CPUs. To run Simultaneous Multi-Threading (SMT) with a 4-way virtual processor partition with 2.0 processing units of entitlement, how many logical CPUs will be allocated?()
Companycom has plans to deploy a large database solution. Their primary requirement is minimal user access downtime. They are comparing a single server implementation with a two server deployment.What solution would they use to avoid downtime for OS software maintenance?()
Micro-Partitioning can be defined as().
How can dedicated processors be differentiated from virtual processors from a physical processor viewpoint?()