单项选择题A solution provider has proposed a pSeries solution to a new customer.  The solution is complex with a number of technologies that are new to the customer. They have a tight timeline for implementation.  The solution provider has not been able to get a clear understanding as to how the customer will backup the system.  What would be the most appropriate action to address the risks with this solution?()

A.Sell Sysback
B.Conduct a SAR
C.Sell Supportline
D.Provide a project timeline


您可能感兴趣的试卷

你可能感兴趣的试题

1.单项选择题What is one benefit of using the IBM eConfig configuration tool?()

A.It warns users of parts availability constraints.
B.It provides a record of discounts used in the past.
C.It optimizes the adapter selection based on function and cost.
D.It provides validation of acceptable combinations of components.

2.单项选择题

A customer is interested in obtaining an AIX solution from IBM.  They have two primary global requirements:  
? Availability (although HACMP is not required)  
? Low cost  
Which of the following approaches should the pSeries technical specialist use to meet the customer’s requirements and ensure customer satisfaction?()

A.Design the least-cost solution to prevent the competition from winning the business.
B.Design a disaster recovery (DR) solution and convince the customer why DR is important to their business.
C.Use the HACMP specialist to design the solution and include HA SmoothStart services as part of the proposal.
D.Design a solution with redundant parts and explain to the customer the incremental cost associated with the redundancy.

5.单项选择题The account team is putting together a very complex solution for the customer.  During the solution design phase, many of the customer’s requirements have changed and additional requirements are being identified.  What should the pSeries technical specialist do to ensure the greatest possible customer satisfaction?()

A.Use eConfig to configure and validate each pSeries and p5 system.
B.Engage Advanced Technical Support to review any outstanding technical issues.
C.Confirm with the customer that the solution design meets their requirements.
D.Perform a Pre-Install Solution Assurance Review to validate required power requirements.

6.单项选择题A customer plans to order several new pSeries systems and is concerned that the additional heat load may overwhelm the current air-handling system.  How might the pSeries technical specialist aid the customer in addressing their concern?()

A.Direct the customer to the Installation Guide for each system to identify the power requirements.
B.Direct the customer to engage their site personnel to ensure the proper power connectors are provided to support the systems.
C.Direct the customer to the Site and Hardware Planning Information and review the system requirements for each new pSeries system.
D.Direct the customer to the Site and Hardware Planning Information to confirm that enough space is available in the rack to allow for proper airflow.

7.单项选择题A customer currently has five partitioned POWER4 systems and is adding new systems.  When the pSeries technical specialist introduces the first p5 system with CoD into this environment, how should the HMC be handled?()

A、Order a new HMC to support the p5 system.
B、Attach the new p5 system to the existing HMC.
C、Upgrade the existing HMC to accommodate both the POWER4 and p5 systems.
D、Do nothing.  This system does not require an HMC.

10.单项选择题The pSeries technical specialist is designing a two LPAR p5-570 with eight total processors.  The system is a test system to run AIX 5.2.  The customer has stated a preference for internal disks for the boot devices.  The customer has said they may later need to run three or four LPARs without increasing the number of processors. What should the pSeries technical specialist tell the customer about the ability of the p5-570 to meet their requirements?()

A.It will require additional SCSI adapters and I/O drawers or external disks to support more than two LPARs.
B.It has sufficient built-in SCSI controllers and disk enclosures to support four total LPARs by only adding the necessary additional disks.
C.It is unable to use internal disks for LPARs and therefore additional adapters I/O drawers or external disks must be used to support all LPARs.
D.It can support six LPARs with internal disks but will require special features, cables and an adapter to support the additional LPARs with internal disks.

最新试题

A customer has a large UNIX environment and has engaged a pSeries technical specialist to work on a solution with them.  Which of the following statements would best establish UNIX credibility with a knowledgeable customer?()

题型:单项选择题

A customer wants to receive automatic notification of critical software problems and fixes for their RS/6000 or eServer pSeries system.  Which is the most appropriate services offering to recommend to them?()

题型:单项选择题

A customer wants to upgrade an existing pSeries system.  In addition to retrieving the IBM configuration records, what else should be done to ensure an accurate upgrade quote is provided?()

题型:单项选择题

A customer wants a configuration for a new system that includes Reserve CoD.  Which of the following systems would be the most appropriate to configure for them?()

题型:单项选择题

A customer needs a new 4-way p630 with three partitions to support three AIX 5.2 applications.  Each partition requires two of the following:  OS boot drives, fiber adapters, and gigabit Ethernet adapters.  The customer has an HMC with an available serial port.  In addition to the model 6C4, which of the following is required to meet the customer’s requirements?()

题型:单项选择题

A customer asks the pSeries technical specialist to recommend which remote access (SSH or Telnet) method to use.  What question should the customer be asked to best determine the proper recommendation?()

题型:单项选择题

A customer has a failing HBA adapter and needs to identify the location of the adapter.  Which of the following AIX commands should the specialist recommend the customer review?()

题型:单项选择题

A state agency has recently deployed a new application on an 8-way p5-570 that is critical to the agency’s operation.  There is no manual method to perform the business process.  The state government has just mandated that all state agencies have disaster recovery plans that allow the agencies to recover critical applications in acceptable periods of time with no loss of performance. Based on this new business requirement, what is this agency most likely to need?()

题型:单项选择题

A new p5 customer has just installed a partitioned p5-550 alongside some older POWER4 servers.  The pSeries technical specialist has received a call to say that the existing HMC (7315) cannot connect to the new server.  How can the specialist help the customer?()

题型:单项选择题

A customer is considering multiple options for a particular set of workloads on AIX v5.2.  They need to run ten identical LPARS, each containing four fibre cards, two 2-port Ethernet cards, and one SCSI card as well as two internal boot disks.  They want the LPARS to be split across two physical systems for redundancy purposes; cost is an issue.  They need a total of approximately 40 rPerf for all ten workloads. Which of the following solutions best fits these needs?()

题型:单项选择题