Project work packages are typically decomposed into smaller components called activities to provide a basis for()scheduling, executing, and monitoring and controllingthe proj ect work.
A.reviewing
B.estimating
C.auditing
D.expecting
您可能感兴趣的试卷
你可能感兴趣的试题
Define Activities is the process ofidentifying the specific actions to be performed toproduce the()
A.projectelements
B.work drafts
C.workpackage
D.projectdeliverables
The receiving activities conduct analyses of the requirements with the requirements provider to ensure that a compatible, shared understanding is reached on the meaning of the requirements. The result ofthis analysis and dialog is an()set of requirements.
A.agreed-to
B.agree-to
C.agree-to-do
D.agree-with
()involves using mathematical techniques to forecast future outcomes based onhistorical results.
A.Trendanalysis
B.Qualityaudit
C.Defect repair review
D.Flowcharting
Performing()involves monitoring specific project results to determine if they comply with relevant quality standards and identifying ways to eliminate causes of unsatisfactory results.
A.qualityplanning
B.qualityassurance
C.qualityperformance
D.quality control
The project()is a key input to quality planning since it documents major project deliverables, the project objectives that serve to define important stakeholder requirements,thresholds, and acceptance criteria.
A.work performance information
B.scope statement
C.changerequests
D.process analysis
The project team members should also be aware of one of the fundamental tenets of modern quality management: quality is planned, designed and built in, not()
A.executedin
B.inspectedin
C.check-in
D.look-in
Project Quality Management processes include all the activities of the()that determine quality policies, objectives and responsibilities so that the project will satisfy theneeds for which it was undertaken.
A.Project
B.project management team
C.performingorganization
D.customer
The()process analyzes the effect of risk events and assigns a numerical rating to those risks.
A.Riskldentification
B.Quantitative RiskAnalysis
C.Qualitative RiskAnalysis
D.Risk Monitoring and Control
A.Integration
B.Time
C.Planning
D.Communication
最新试题
Changes may be requested by any stakeholder involved with the project, but changes can be authorized only by()
空白(3)处填()
空白(1)处填()
空白(2)处填()
Contract closeout is a process that involves()
The parties to government procurement refer to the principal entities of all kinds that enjoy rights and undertake obligations in government procurement, including the procuring entities, the ()and the procuring agencies.
空白(2)处填()
An example of scope verification is ().
空白(2)处填()
Creating WBS means subdividing the major project deliverables into smaller components until the deliverables are defined to the level()