A.by the weight (tons) of cargo
B.by the capacity (tons) of vessel
C.by DW of the vessel
D.by the draft of the vessel
您可能感兴趣的试卷
你可能感兴趣的试题
A.chartering
B.dispatching
C.fixing
D.tendering
A.on
B.to
C.at
D.in
A.provides
B.becomes
C.contains
D.comes
A.on
B.in
C.under
D.at
A.be carried out
B.encountered
C.be met with
D.be bringing
A.Charterers
B.Owners
C.both Charterers and Owners
D.neither Charterers nor Owners
A.whether
B.should
C.shall
D.if
A.Shipowner
B.Charterer
C.carrier
D.shipper
A.supplied
B.complied
C.provided
D.implied
A.In the event of
B.In default of
C.In spite of
D.In respect of
最新试题
The carrier is entitled to()overboard goods which are dangerous.
If the Charterer nominates an unsafe port and the ship is damaged through going there,() will be liable for the damage,subject to that the master acts reasonably in going there.
The merchant undertakes that no claim or allegation shall be made against any servant,agent or subcontractor of the carrier which()to impose upon any of them or any liability whatsoever in connection with the goods.
The carrier is entitled to limit his liability to the stated sum per package or unit even if he failedto exercise due diligence to make the vessel().
Both the Shipowner and the Charterer will be discharged from their obligations under the charter-party if it()frustrated.
()payment of the hire the Owners may withdraw the Vessel from the service of Charterers,without prejudice to any claim Owners may otherwise have on Charterers under this Charter.
The object of the both-to-blame collision clause is().
If the Shipowner fails to give the Charterer the notice of readiness to load,and delay in commencing to load is thereby caused,the Charterer will (),as he is not bound to look out for the ship.
If the place named for the loading is simply a port or dock,notice of readiness may be given as soon as the ship arrives()although she is not in the particular spot where the loading is to take place.
Where a charter-party states that a claim will be barred unless the claimant appoints an arbitrator within a specified period,the nominated arbitrator must be actually()within that period that has been appointed.