While planning the logical volume design of a new install, Companycom considered using a striped logical volume for performance. They want to be able to extend the logical volume in the future.
Which of the following actions will provide this capability?()
A.Add additional logical volumes two at a time
B.Add additional physical volumes two at a time
C.Create a columned striped logical volume using -C option of mklv
D.Create an extendable striped logical volume using -E option of mklv
您可能感兴趣的试卷
你可能感兴趣的试题
A.Backup critical console data
B.Backup a bootable image to tape
C.Create mksysb image and store on a NIM server
D.Create mksysb image and store on an NFS server
Companycom has a requirement to consolidate six web application servers. There is unused capacity of 2 CPUs on their new p5 570.
Which operating systems and or features are required?()
A.APV, AIX5.2ML4
B.AIX5.3 or i5/OS
C.APV, i5/OS, AIX5.3
D.APV, AIX5.3 or SuSE9
A.Run importvg command
B.Run synclvodm command
C.Recreate volume groups
D.Update /etc/filesystems
A solution for two batch applications was proposed in Companycom meeting. They are currently running in two LPARs on a p690. On a daily basis, both applications use 15% of the machine for their workload, and increase to 100% when their weekly reports are run.
Since the reports are not run on the same day, what is the best solution?()
A.COD
B.DLPAR
C.One big LPAR
D.Two separate p690 machines
A.Use savevg and copy to an NFS filesystem
B.Create a mksysb on an NFS exported filesystem
C.Use tar to copy system over network with a pipe
D.Create mksysb on an NFS exported NIM filesystem
Companycom is planning a p5 595 running AIX 5L 5.3 LPARs. They would like to design the system using physical resources with maximum resource efficiency. One LPAR requires a peak load of 30 processors during the week with a low of 1 processor required on the weekend. The other LPAR requires only a single processor most of the time, but needs at least 24 processors at the beginning of the weekend to finish its weekly processing in the window allocated.
Which of the following solutions is most appropriate to continuously maximize resource use for these two LPARs?()
A.Dynamic LPAR
B.Workload Manager
C.Partition Load Manager
D.Shared Processor Pools
An administrator has set up three partitions using a shared processor pool with 2 processors and SMT turned on. The partitions are activated in the following sequence: Partition one: Min = 0.5, max = 3.0, desired = 1.0; Partition two: Min = 1.0, max = 3.0, desired = 1.5 Partition three: Min = 1, max = 0.5, desired = 2.
What is the outcome?()
A.Partition one starts and has 3.0 logical processors. Partition two does not start. Partition three has 1.0 logical processors.
B.Partition one starts and has 1.5 logical processors. Partition two has 1.0 logical processors. Partition three has 0.1 processors.
C.Partition one starts and has 2.0 logical processors. Partition two start and has 2.0 logical processors. Partition three does not start.
D.Partition one starts and has 2.0 logical processors. Partition two has 1.0 logical processors. Partition three has 0.1 logical processors.
A.logform
B.savebase
C.exportvg
D.synclvodm
Companycom wants to buy a new p5 570 running AIX 5.3. The applications require 4 processors and 8GB of memory. There is a requirement to have a Virtual IO Server.
What is the smallest p5 570 that should be sold to this customer?()
A.4 processors 8GB of memory
B.5 processors 8GB of memory
C.4 processors 10GB of memory
D.5 processors 10GB of memory
A.abc123
B.hscroot
C.passw0rd
D.password
最新试题
Companycom is using shared processor LPARs exclusively, including the Virtual IO Server. The users are complaining about response time. The application LPARs can be heavy processor users. The Virtual IO Server has been measured to be processor constrained.How should the Virtual IO Server's shared processor LPAR be configured?()
Companycom has several AS/400 servers in their IT infrastructure running V5R2 that they wish to consolidate. The customer wants to simplify their environment and install i5/OS on a p5 590 with 16 1.65GHz processors and 20 i5/OS partitions. The customer plans to use the Advanced Power Virtualization to share their storage, processors, and memory.What considerations and limitations should be reviewed with the customer before the purchase?()
Companycom has several CR3 HMCs managing their p690 servers. They have purchased a new p5 570 and would like to manage the new system with an existing HMC.What is required to support this environment?()
System configurations on the HMC have been backed up correctly. After a restore, the partitions are defined with different characteristics than the running systems.What is the most probable cause of this problem?()
If using alt_disk_install to install AIX on new LPARs, which of the following will be necessary after booting the new AIX image?()
How can dedicated processors be differentiated from virtual processors from a physical processor viewpoint?()
In addition to the partition profile backup, how should the HMC be backed up to provide bare-metal restore capabilities?()
What is a primary differentiator between pSeries eWLM (Enterprise Workload Manager) and WLM (Workload Manager)?()
The System Administrator has set up shared processors on three partitions in the p5 590 system. The shared processors have been set to uncapped. The system administrator notices that the logical partition is acting like it is capped.What is the most probable cause?()
Companycom is buying an application solution that bases its software licensing on the number of CPUs per machine. They will be running two instances of this application and will require 8 CPUs each. A second application is priced based on CPUs per LPAR as well as the class of machine. That application will require 8 CPUs.What is the best hardware to propose to keep the software cost low?()