Companycom has several CR3 HMCs managing their p690 servers. They have purchased a new p5 570 and would like to manage the new system with an existing HMC.
What is required to support this environment?()
A.Free up one HMC and update the software for use with the p5 570
B.Connect the new p5 570 server to an existing HMC and manage the p690s and p5 570 from that HMC
C.Order a new HMC to support the new p5 570 server since the CR3 HMC is not supported for a p5 570
D.Backup the HMC to DVD-RAM and select HMC migrate to move all the profile data to the new HMC software
您可能感兴趣的试卷
你可能感兴趣的试题
System configurations on the HMC have been backed up correctly. After a restore, the partitions are defined with different characteristics than the running systems.
What is the most probable cause of this problem?()
A.The LPAR Configuration backup is corrupt
B.The LPAR Configuration has been altered using DLPAR
C.The LPAR Configuration backup was performed on a different HMC
D.The LPAR Configuration has been altered through the Advanced System Management Interface (ASMI) on the server after the backup was performed
The System Administrator has set up shared processors on three partitions in the p5 590 system. The shared processors have been set to uncapped. The system administrator notices that the logical partition is acting like it is capped.
What is the most probable cause?()
A.The uncapped weight has been set to 0.
B.The uncapped weight has been set to 128.
C.The processing unit for that partition was set to .1 processing units. A full processor was assigned.
D.The processing unit for that partition was set to 0.50 processing units. A full processor was assigned.
A.lsmap -all -net
B.lsclient -disk -net
C.lsdev -virtual -client
D.lsmap -all; lsmap -net
Companycom is moving their application to a p5 590 and at the same time moving to a new version of the application. The customer knows only about the resource requirements of the old version.
Which of the following is the best method to migrate their application to POWER5?()
A.Add CPU and memory COD so they have room to grow if required
B.Make the server configuration twice as large as the current requirement
C.Configure the server for the current capacity requirements
D.Make the server configuration a little larger than the current capacity requirements
Companycom recently ordered a p5 570 and an HMC. Prior to delivery, two additional p5 570 servers were added to the order. Upon installation, the system administrator noticed that they do not have a method to connect the p5 570 servers to the HMC.
Which of the following will allow them to connect all servers to the HMC?()
A.An 8-port adapter to the HMC
B.A hub for the private network
C.An additional Ethernet card to the HMC
D.An additional Ethernet card for each partition
Companycom is migrating from a p690 to a p5 595 utilizing APV Virtual IO features. They have created their profiles for their two Virtual IO Servers. The first Virtual IO Server is installed and running. When trying to DLPAR the DVD/ROM the task fails on the HMC.
What is the probable cause?()
A.APV key is not registered
B.Networking and DNS are not configured
C./etc/hosts table on HMC is not configured
D.Virtual IO Server dose not support DLPAR
A.vmo to adjust the maxperm value
B.schedo to adjust the mempool size
C.ioo to modify the maxpgahead value
D.bosboot to reassign the memory cache size
A.A SAN device
B.First I/O drawer
C.Any I/O drawer within the main frame
D.First I/O drawer within the expansion frame
Companycom is buying an application solution that bases its software licensing on the number of CPUs per machine. They will be running two instances of this application and will require 8 CPUs each. A second application is priced based on CPUs per LPAR as well as the class of machine. That application will require 8 CPUs.
What is the best hardware to propose to keep the software cost low?()
A.A 24 way p5 595 with 3 LPARs
B.A 24 way p5 595 with 2 LPARs
C.One p5 570s 16 way and one p5 570 8 way
D.One p5 595 12 way active and 12 way inactive, and one p5 570 8 way
A.Restart the rsct and inetd daemons
B.Customize the node setting in /etc/services
C.Rename the rootvg filesystems to their original names
D.Customize the node_id file and restart the rsct daemons
最新试题
Companycom has purchased a p5 590 with 16 CPUs. To run Simultaneous Multi-Threading (SMT) with a 4-way virtual processor partition with 2.0 processing units of entitlement, how many logical CPUs will be allocated?()
A client is experiencing issues after cloning an LPAR using alt_disk_install. DLPAR functions are not available for the new LPAR. Also, there is a lot of network traffic to the HMC.What is the most probable cause of this problem?()
Companycom has seven days of vmstat data on a p5 590. The server has a total of four test/dev LPARs and 4 production LPARs of one processor each. On the four test/dev LPARs, the data shows 90-95% peak utilizations with a duration of from 5 to 10 minutes. The average utilizations of all LPARs were between 15-30%. All of the applications have different times when they peak. What is the best configuration to fully utilize the processor resource?()
What type of configuration can provide the best availability in a Virtual IO Server environment?()
Companycom has a Linux LPAR on a p5 570 server. The 3rd party storage subsystem devices are not supported by Linux.How would access be provided to the storage subsystem devices for this Linux LPAR?()
Companycom is buying an application solution that bases its software licensing on the number of CPUs per machine. They will be running two instances of this application and will require 8 CPUs each. A second application is priced based on CPUs per LPAR as well as the class of machine. That application will require 8 CPUs.What is the best hardware to propose to keep the software cost low?()
A client will be creating partitions on multiple systems with identical configurations. What is the recommended method for cloning the master partition?()
How can dedicated processors be differentiated from virtual processors from a physical processor viewpoint?()
Companycom is trying to communicate with the service processor of the a new p5 590. However, the customer can not access the service processor.What needs to be done to fix this problem?()
Companycom is using shared processor LPARs exclusively, including the Virtual IO Server. The users are complaining about response time. The application LPARs can be heavy processor users. The Virtual IO Server has been measured to be processor constrained.How should the Virtual IO Server's shared processor LPAR be configured?()