单项选择题]If a charter-party,although for two consecutive voyages,is held to be one indivisible contract,a deviation on the first voyage entitles the Charterer to treat the breach as a repudiation of()contract.

A.a part of
B.the whole
C.3/4th of
D.1/2nd of


您可能感兴趣的试卷

你可能感兴趣的试题

1.单项选择题Freight rates are mostly charged().

A.by the weight (tons) of cargo
B.by the capacity (tons) of vessel
C.by DW of the vessel
D.by the draft of the vessel

2.单项选择题Delivery of a vessel to a charterer is called().

A.chartering
B.dispatching
C.fixing
D.tendering

最新试题

The carrier has,before and at the beginning of the voyage,to()due diligence to make the ship seaworthy.

题型:单项选择题

According to Gencon,if at any time during the currency of this Charter,both Owners and Charterers are unable to arrange bunkers at the main bunkering ports for the voyage in question,the()to have the privilege of canceling this Charter.

题型:单项选择题

Apart from special contract or statute every Shipowner is()a liability akin to that of a common carrier,irrespective of whether the goods were shipped by a Charterer or on a general ship.

题型:单项选择题

Freight rates are mostly charged().

题型:单项选择题

The merchant undertakes that no claim or allegation shall be made against any servant,agent or subcontractor of the carrier which()to impose upon any of them or any liability whatsoever in connection with the goods.

题型:单项选择题

A vessel is not in every way fitted for cargo service()at the time of her delivery to the charterers her engine room staff is incompetent and inadequate,and accordingly she is unseaworthy.

题型:单项选择题

Contracts whereby the possession and control of a ship vest()the Charterer are becoming more common today especially in the oil tanker trade.

题型:单项选择题

Where a charter-party states that a claim will be barred unless the claimant appoints an arbitrator within a specified period,the nominated arbitrator must be actually()within that period that has been appointed.

题型:单项选择题

The object of the both-to-blame collision clause is().

题型:单项选择题

If the Shipowner fails to give the Charterer the notice of readiness to load,and delay in commencing to load is thereby caused,the Charterer will (),as he is not bound to look out for the ship.

题型:单项选择题