A.an indemnity
B.liability
C.responsibility
D.possibility
您可能感兴趣的试卷
你可能感兴趣的试题
A.need
B.need not
C.will
D.to
A.be responsible
B.not be responsible
C.pay the Shipowner for the expenses incurred
D.not claim the Shipowner for the expenses incurred
A.in the loading place
B.in the port or dock
C.in the loading spot
D.in the discharging spot
A.he
B.she
C.the owner
D.the shipper
A.broken space
B.dead weight
C.constant
D.dead freight
A.a part of
B.the whole
C.3/4th of
D.1/2nd of
A.by the weight (tons) of cargo
B.by the capacity (tons) of vessel
C.by DW of the vessel
D.by the draft of the vessel
A.chartering
B.dispatching
C.fixing
D.tendering
A.on
B.to
C.at
D.in
A.provides
B.becomes
C.contains
D.comes
最新试题
A vessel is not in every way fitted for cargo service()at the time of her delivery to the charterers her engine room staff is incompetent and inadequate,and accordingly she is unseaworthy.
If a full cargo is not loaded,the Charterer must pay not only freight on the goods actually shipped but also().
The carrier has,before and at the beginning of the voyage,to()due diligence to make the ship seaworthy.
Where a propeller shaft passes through the hull,water is prevented from entering by means of a().
If the place named for the loading is simply a port or dock,notice of readiness may be given as soon as the ship arrives()although she is not in the particular spot where the loading is to take place.
]If a charter-party,although for two consecutive voyages,is held to be one indivisible contract,a deviation on the first voyage entitles the Charterer to treat the breach as a repudiation of()contract.
The carrier is entitled to limit his liability to the stated sum per package or unit even if he failed to exercise due diligence to make the vessel().
The carrier can obtain()for loss caused to him by the shipper stating the particulars of the goods inaccurately.
If the Charterer nominates an unsafe port and the ship is damaged through going there,() will be liable for the damage,subject to that the master acts reasonably in going there.
If the Shipowner fails to give the Charterer the notice of readiness to load,and delay in commencing to load is thereby caused,the Charterer will (),as he is not bound to look out for the ship.