A. RAID 0+1
B. RAID 1+5
C. RAID 3
D. Hybrid RAID 5+
您可能感兴趣的试卷
你可能感兴趣的试题
A. multiple AIT (Advanced Intelligent Tape) drives configured for each server
B. a standalone LTO (Linear Tape-Open) drive configured for all servers
C. standalone DAT (Digital Audio Tape) drives configured for each server
D. a tape library unit with more then one DAT (Digital Audio Tape) drive configured for all servers
E. a tape library unit with more the one SDLT (SuperDLT) drive configured for all servers
A. configuring a second network card with a different IP address
B. replacing the existing 100 Mbps NIC with a gigabit Ethernet NIC
C. using adapter teaming and configuring the second network card with the same IP address as the first network card
D. installing a dual-port network card that can handle the future growth and setting one NIC to 10 Mbps and one NIC to 100 Mbps
Two new servers are purchased and need to be installed to allow sharing of a single external hard drive enclosure.
One server is configured as a local file server, and the other as a database server for a different network. The onsite technician notices that when both servers are running at the same time, they each receive SCSI errors. When they are running individually, no errors are reported.
Which of the following is the BEST source of information to use for troubleshooting this problem?()
A. the server vendor’s FAQ website
B. the SCSI controller vendor’s user manual
C. the drive enclosure vendor’s user manual
D. the network operating system vendor’s website
A. 132 Mbps
B. 256 Mbps
C. 264 Mbps
D. 450 Mbps
A.SCSI-1
B.SCSI-3
C.SCSI-2
D.SCSI-4
A. mail server
B. DNS server
C. web server
D. WINS server
E. DHCP server
A. RAID
B. tape library
C. optical storage
D. disk to disk to tape
A technician purchases a new 120 GB IDE hard disk to use in an old server as a swap drive. After adding the drive to the server, the technician discovers that the operating system does not detect the drive.
After rebooting the server, the technician notices the drive is missing from POST and comes to the conclusion that the BIOS needs to be updated. The technician downloads the latest version of the BIOS update from the manufacturer website.
Which action should the technician take next?()
A. backup the BIOS configuration to use later
B. install the BIOS update from a command prompt
C. create a bootable floppy and copy the BIOS update tools to the floppy
D. read the manufacturer’s guidelines and recommendations on installing the update
A. MIB (Management Information Base)
B. OID (ObjectIDentifier)
C. register
D. community name
A. The SCSI card is not seated correctly.
B. The termination is incorrectly set on the SCSI card.
C. The SCSI card is not listed on the operating system HCL (Hardware Compatibility List).
D. Operating system patches were not updated before installing the card.
最新试题
A technician needs to install the first SCSI controller in an application server. The SCSI card is factory-configured with a SCSI ID of 1. Which SCSI ID should the technician configure the card before installation?()
Why is it important to have a final meeting on a project that has been cancelled?()
Team selection is not just a function of finding someone whos a technical or administrative expert. What will a project sponsor leading a high visibility project look for in a project manager?()
Which backup solution is the MOST appropriate for backing up a payload from a corporation with multiple servers and approximately 300 GB of data?()
What is the role of the line manager in a project plan?()
Within Information Technology projects, communications between the project manager and the project team members should take place:()
A large corporation is concerned about the amount of time it takes to back up their main file server. They are also concerned that their IT technician frequently forgets to change the backup tapes, thereby leaving the company open to data loss. Which backup system would solve both problems?()
An Ultra 160 or Ultra 320 device falls under which SCSI standard?()
The project sponsor wants the project manager to develop and implement Quality Management techniques to ensure a smooth project transition to the deployment phase. What is an appropriate Quality Management technique to implement?()
Two new servers are purchased and need to be installed to allow sharing of a single external hard drive enclosure. One server is configured as a local file server, and the other as a database server for a different network. The onsite technician notices that when both servers are running at the same time, they each receive SCSI errors. When they are running individually, no errors are reported. Which of the following is the BEST source of information to use for troubleshooting this problem?()