A.Evaluate phase exit milestones using sufficiency criteria
B.Flexible entry and exit criteria to minimize schedule delays
C.Quality measures reported only to the project steering committee
D.Many work teams with few members to maximize the number of deliverable hand-offs
您可能感兴趣的试卷
你可能感兴趣的试题
A.The high level budget estimates are inaccurate
B.The organizational spending plan is inaccurate
C.The budget is not aligned with the spending plan of the organization
D.The detailed bottom up budget will need to be adjusted
A.Provide resources to a project
B.Request requirements changes
C.Resolve team conflicts
D.Control the project budget
A.project plan.
B.project charter.
C.communication plan.
D.WBS (Work Breakdown Structure).
A.Document lessons learned
B.Assign responsibility
C.Close budget
D.Begin new project
A.Project Manager
B.Stakeholder
C.Customer
D.Executive Sponsor
A.Design Acceptance
B.Code Acceptance
C.Module Acceptance
D.Site Acceptance
A.source code.
B.passwords.
C.lessons learned.
D.test results.
A customer wants to increase the performance of an existing server. They are running a very network intensive application and feel that increasing the bandwidth to the network will fix their problem.
They are running two 24-port autosensing 10/100 hubs, tied together with a standard Ethernet crossover cable in port 24.
The server is running IPX. After adding a second network card and plugging one card into each hub, they have not seen any performance improvement.
Which two are likely reasons why implementing network adapter teaming has not improved performance?()
A. Adapter teaming is designed to work with switches.
B. Adapter teaming only functions with gigabit network cards.
C. Adapter teaming only provides fault tolerance, not additional bandwidth.
D. Adapter teaming only works with IPX when using switches and network cards with special features that support teaming.
A. 0
B. 1
C. 4
D. 7
A. SE (Single Ended)
B. DE (Double Ended)
C. LVD (Low Voltage Differential)
D. HVD (High Voltage Differential)
最新试题
The latest SCSI adaptor card is purchased from a vendor. Drivers for the operating system cannot be obtained. The SCSI adapter card is added to an existing server. Upon booting, the operating system does not detect the card. Which of the following is the MOST likely cause of the problem?()
A customer wants to increase the performance of an existing server. They are running a very network intensive application and feel that increasing the bandwidth to the network will fix their problem. They are running two 24-port autosensing 10/100 hubs, tied together with a standard Ethernet crossover cable in port 24. The server is running IPX. After adding a second network card and plugging one card into each hub, they have not seen any performance improvement. Which two are likely reasons why implementing network adapter teaming has not improved performance?()
A company plans to upgrade a network server. Before proceeding with the upgrade, the HCL (Hardware Compatibility List) and hardware is checked and necessary backups and documentation are made. The existing 512 MB of SDRAM is replaced with 1024 MB. The 10 Mbps network card is replaced with a 10/100 PCI network card. When the server restarts, beeps sound and the server does not pass the POST. Which of the following is the MOST likely cause of the problem?()
The project manager is developing a project schedule. The project manager negotiated with all the execution organizations, and the task times are as short as possible. After manipulating the schedule, the project completion date is still beyond the date requested by the business owners of the project. The project manager believes that the content agreed on for the project is appropriate, and concludes that this schedule should be taken to the business owners and renegotiated. Which one of the following tools will help the project manager justify the revised schedule?()
After upgrading the SNMP (Simple Network Management Protocol) protocol, the ()can be looked up. It is a sequence of integers that uniquely identifies a path to a managed object.
The current data center has run out of space. A room that is located next to the existing data center is then used to house two racks containing six servers. Six months later, physical housekeeping is performed as part of a mid-year maintenance plan. Which environmental condition discovered in the room is LEAST critical?()
The project sponsor wants the project manager to develop and implement Quality Management techniques to ensure a smooth project transition to the deployment phase. What is an appropriate Quality Management technique to implement?()
What is a reason for reviewing the user requirements document with the client?()
Acceptance of deliverables to multiple locations requires which type of sign off?()
The SOW (Statement of Work) is another name for the:()