单项选择题Team member listing, scheduled tasks, and risk identification are part of the:()

A.project plan.
B.project charter.
C.communication plan.
D.WBS (Work Breakdown Structure).


您可能感兴趣的试卷

你可能感兴趣的试题

1.单项选择题Why is it important to have a final meeting on a project that has been cancelled?()

A.Document lessons learned
B.Assign responsibility
C.Close budget
D.Begin new project

2.单项选择题Who is responsible for authorizing closure of the project?()

A.Project Manager
B.Stakeholder
C.Customer
D.Executive Sponsor

3.单项选择题Acceptance of deliverables to multiple locations requires which type of sign off?()

A.Design Acceptance
B.Code Acceptance
C.Module Acceptance
D.Site Acceptance

4.单项选择题The last deliverable at the Close Out meeting is:()

A.source code.
B.passwords.
C.lessons learned.
D.test results.

8.单项选择题After upgrading a server motherboard to the latest firmware revision, configuring LAN access in the SSU (System Setup Utility) fails. Which action should be taken FIRST to correct this problem?()

A. replace the NIC
B. install the latest SSU (System Setup Utility) version
C. upgrade the firmware on the NIC
D. assign the NIC a static IRQ in the SSU (System Setup Utility)

9.单项选择题The current data center has run out of space. A room that is located next to the existing data center is then used to house two racks containing six servers. Six months later, physical housekeeping is performed as part of a mid-year maintenance plan. Which environmental condition discovered in the room is LEAST critical?()

A. There are discolored ceiling tiles near the middle of the room.
B. Large amounts of dust have accumulated in the corners of the room.
C. The anti-static carpet has been removed resulting in a bare painted concrete floor.
D. A wet pipe water-based sprinkler system has been installed above the racks.

10.单项选择题Which RAID standard combines data striping across drives with mirroring?()

A. RAID 0+1
B. RAID 1+5
C. RAID 3
D. Hybrid RAID 5+

最新试题

Team selection is not just a function of finding someone whos a technical or administrative expert. What will a project sponsor leading a high visibility project look for in a project manager?()

题型:单项选择题

Which RAID standard combines data striping across drives with mirroring?()

题型:单项选择题

What is a reason for reviewing the user requirements document with the client?()

题型:单项选择题

Which is the MOST effective method for generating support for your project plan?()

题型:单项选择题

Which of the following SCSI signaling systems uses one return line for every outgoing line, is less susceptible to interference, signal degradation, crosstalk, and allows a cable length of up to 25 meters?()

题型:单项选择题

Which throughput does a 33 MHz, 33-bit bus have?()

题型:单项选择题

Who is responsible for authorizing closure of the project?()

题型:单项选择题

As a rule of thumb for QA (Quality Assurance) activities, how many hours of downstream QA (Quality Assurance) costs are saved for each hour spent on technical reviews early in the project?()

题型:单项选择题

Why does a project manager need an executive sponsor?()

题型:单项选择题

Which backup solution is the MOST appropriate for backing up a payload from a corporation with multiple servers and approximately 300 GB of data?()

题型:单项选择题