A.Document lessons learned
B.Assign responsibility
C.Close budget
D.Begin new project
您可能感兴趣的试卷
你可能感兴趣的试题
A.Project Manager
B.Stakeholder
C.Customer
D.Executive Sponsor
A.Design Acceptance
B.Code Acceptance
C.Module Acceptance
D.Site Acceptance
A.source code.
B.passwords.
C.lessons learned.
D.test results.
A customer wants to increase the performance of an existing server. They are running a very network intensive application and feel that increasing the bandwidth to the network will fix their problem.
They are running two 24-port autosensing 10/100 hubs, tied together with a standard Ethernet crossover cable in port 24.
The server is running IPX. After adding a second network card and plugging one card into each hub, they have not seen any performance improvement.
Which two are likely reasons why implementing network adapter teaming has not improved performance?()
A. Adapter teaming is designed to work with switches.
B. Adapter teaming only functions with gigabit network cards.
C. Adapter teaming only provides fault tolerance, not additional bandwidth.
D. Adapter teaming only works with IPX when using switches and network cards with special features that support teaming.
A. 0
B. 1
C. 4
D. 7
A. SE (Single Ended)
B. DE (Double Ended)
C. LVD (Low Voltage Differential)
D. HVD (High Voltage Differential)
A. replace the NIC
B. install the latest SSU (System Setup Utility) version
C. upgrade the firmware on the NIC
D. assign the NIC a static IRQ in the SSU (System Setup Utility)
A. There are discolored ceiling tiles near the middle of the room.
B. Large amounts of dust have accumulated in the corners of the room.
C. The anti-static carpet has been removed resulting in a bare painted concrete floor.
D. A wet pipe water-based sprinkler system has been installed above the racks.
A. RAID 0+1
B. RAID 1+5
C. RAID 3
D. Hybrid RAID 5+
A. multiple AIT (Advanced Intelligent Tape) drives configured for each server
B. a standalone LTO (Linear Tape-Open) drive configured for all servers
C. standalone DAT (Digital Audio Tape) drives configured for each server
D. a tape library unit with more then one DAT (Digital Audio Tape) drive configured for all servers
E. a tape library unit with more the one SDLT (SuperDLT) drive configured for all servers
最新试题
Which backup solution is the MOST appropriate for backing up a payload from a corporation with multiple servers and approximately 300 GB of data?()
Two new servers are purchased and need to be installed to allow sharing of a single external hard drive enclosure. One server is configured as a local file server, and the other as a database server for a different network. The onsite technician notices that when both servers are running at the same time, they each receive SCSI errors. When they are running individually, no errors are reported. Which of the following is the BEST source of information to use for troubleshooting this problem?()
The project manager is developing a project schedule. The project manager negotiated with all the execution organizations, and the task times are as short as possible. After manipulating the schedule, the project completion date is still beyond the date requested by the business owners of the project. The project manager believes that the content agreed on for the project is appropriate, and concludes that this schedule should be taken to the business owners and renegotiated. Which one of the following tools will help the project manager justify the revised schedule?()
Which factor has the greatest impact on the estimated per unit labor cost for a project?()
The project sponsor wants the project manager to develop and implement Quality Management techniques to ensure a smooth project transition to the deployment phase. What is an appropriate Quality Management technique to implement?()
A large corporation is concerned about the amount of time it takes to back up their main file server. They are also concerned that their IT technician frequently forgets to change the backup tapes, thereby leaving the company open to data loss. Which backup system would solve both problems?()
Which of the following SCSI signaling systems uses one return line for every outgoing line, is less susceptible to interference, signal degradation, crosstalk, and allows a cable length of up to 25 meters?()
Who is responsible for authorizing closure of the project?()
Why is it important to have a final meeting on a project that has been cancelled?()
Within Information Technology projects, communications between the project manager and the project team members should take place:()