A.by written and oral communication.
B.via a weekly status report.
C.through the formal chain of command.
D.with approved template forms.
您可能感兴趣的试卷
你可能感兴趣的试题
A.To gain the client’s acceptance of the detailed design
B.To verify mutual understanding of project resources
C.To verify mutual understanding of the detailed project plan
D.To verify mutual understanding of targeted product performance
E.To verify mutual understanding of the tests that will be done after the product is completed
A.WBS (Work Breakdown Structure).
B.cost benefit analysis.
C.requirements specifications.
D.narrative description of the work to be accomplished.
A.Up to 5
B.Up to 10
C.Up to 15
D.Up to 20
A.Probability-Impact matrix
B.Pareto chart
C.R-Chart
D.PERT (Program Evaluation and Review Technique) analysis
A.Requiring stakeholders to sign-off on project plan components
B.Requesting input from all stakeholders during the planning process
C.Providing an open line of communication regarding the project
D.Clearly illustrating how the project relates to the company’s objectives
A.Historical information
B.Use of outside vendors
C.Change control processes
D.Human resource skill level requirements
A.Evaluate phase exit milestones using sufficiency criteria
B.Flexible entry and exit criteria to minimize schedule delays
C.Quality measures reported only to the project steering committee
D.Many work teams with few members to maximize the number of deliverable hand-offs
A.The high level budget estimates are inaccurate
B.The organizational spending plan is inaccurate
C.The budget is not aligned with the spending plan of the organization
D.The detailed bottom up budget will need to be adjusted
A.Provide resources to a project
B.Request requirements changes
C.Resolve team conflicts
D.Control the project budget
A.project plan.
B.project charter.
C.communication plan.
D.WBS (Work Breakdown Structure).
最新试题
If the organizational spending plan has allocated $100,000 for a project, and the high level budget estimate for that project is $200,000; which of the following is accurate?()
Who is responsible for authorizing closure of the project?()
A technician needs to install the first SCSI controller in an application server. The SCSI card is factory-configured with a SCSI ID of 1. Which SCSI ID should the technician configure the card before installation?()
Which factor has the greatest impact on the estimated per unit labor cost for a project?()
Which RAID standard combines data striping across drives with mirroring?()
Within Information Technology projects, communications between the project manager and the project team members should take place:()
Team member listing, scheduled tasks, and risk identification are part of the:()
A company plans to upgrade a network server. Before proceeding with the upgrade, the HCL (Hardware Compatibility List) and hardware is checked and necessary backups and documentation are made. The existing 512 MB of SDRAM is replaced with 1024 MB. The 10 Mbps network card is replaced with a 10/100 PCI network card. When the server restarts, beeps sound and the server does not pass the POST. Which of the following is the MOST likely cause of the problem?()
Why is it important to have a final meeting on a project that has been cancelled?()
Which is the MOST effective method for generating support for your project plan?()