A.The high level budget estimates are inaccurate
B.The organizational spending plan is inaccurate
C.The budget is not aligned with the spending plan of the organization
D.The detailed bottom up budget will need to be adjusted
您可能感兴趣的试卷
你可能感兴趣的试题
A.Provide resources to a project
B.Request requirements changes
C.Resolve team conflicts
D.Control the project budget
A.project plan.
B.project charter.
C.communication plan.
D.WBS (Work Breakdown Structure).
A.Document lessons learned
B.Assign responsibility
C.Close budget
D.Begin new project
A.Project Manager
B.Stakeholder
C.Customer
D.Executive Sponsor
A.Design Acceptance
B.Code Acceptance
C.Module Acceptance
D.Site Acceptance
A.source code.
B.passwords.
C.lessons learned.
D.test results.
A customer wants to increase the performance of an existing server. They are running a very network intensive application and feel that increasing the bandwidth to the network will fix their problem.
They are running two 24-port autosensing 10/100 hubs, tied together with a standard Ethernet crossover cable in port 24.
The server is running IPX. After adding a second network card and plugging one card into each hub, they have not seen any performance improvement.
Which two are likely reasons why implementing network adapter teaming has not improved performance?()
A. Adapter teaming is designed to work with switches.
B. Adapter teaming only functions with gigabit network cards.
C. Adapter teaming only provides fault tolerance, not additional bandwidth.
D. Adapter teaming only works with IPX when using switches and network cards with special features that support teaming.
A. 0
B. 1
C. 4
D. 7
A. SE (Single Ended)
B. DE (Double Ended)
C. LVD (Low Voltage Differential)
D. HVD (High Voltage Differential)
A. replace the NIC
B. install the latest SSU (System Setup Utility) version
C. upgrade the firmware on the NIC
D. assign the NIC a static IRQ in the SSU (System Setup Utility)
最新试题
Which action increases server availability?()
Which RAID standard combines data striping across drives with mirroring?()
Which backup solution is the MOST appropriate for backing up a payload from a corporation with multiple servers and approximately 300 GB of data?()
The SOW (Statement of Work) is another name for the:()
Which type of server is responsible for resolving NetBIOS names?()
The project sponsor wants the project manager to develop and implement Quality Management techniques to ensure a smooth project transition to the deployment phase. What is an appropriate Quality Management technique to implement?()
What is the role of the line manager in a project plan?()
Which throughput does a 33 MHz, 33-bit bus have?()
Why is it important to have a final meeting on a project that has been cancelled?()
Team selection is not just a function of finding someone whos a technical or administrative expert. What will a project sponsor leading a high visibility project look for in a project manager?()