单项选择题Who is responsible for authorizing closure of the project?()

A.Project Manager
B.Stakeholder
C.Customer
D.Executive Sponsor


您可能感兴趣的试卷

你可能感兴趣的试题

1.单项选择题Acceptance of deliverables to multiple locations requires which type of sign off?()

A.Design Acceptance
B.Code Acceptance
C.Module Acceptance
D.Site Acceptance

2.单项选择题The last deliverable at the Close Out meeting is:()

A.source code.
B.passwords.
C.lessons learned.
D.test results.

6.单项选择题After upgrading a server motherboard to the latest firmware revision, configuring LAN access in the SSU (System Setup Utility) fails. Which action should be taken FIRST to correct this problem?()

A. replace the NIC
B. install the latest SSU (System Setup Utility) version
C. upgrade the firmware on the NIC
D. assign the NIC a static IRQ in the SSU (System Setup Utility)

7.单项选择题The current data center has run out of space. A room that is located next to the existing data center is then used to house two racks containing six servers. Six months later, physical housekeeping is performed as part of a mid-year maintenance plan. Which environmental condition discovered in the room is LEAST critical?()

A. There are discolored ceiling tiles near the middle of the room.
B. Large amounts of dust have accumulated in the corners of the room.
C. The anti-static carpet has been removed resulting in a bare painted concrete floor.
D. A wet pipe water-based sprinkler system has been installed above the racks.

8.单项选择题Which RAID standard combines data striping across drives with mirroring?()

A. RAID 0+1
B. RAID 1+5
C. RAID 3
D. Hybrid RAID 5+

9.单项选择题Which backup solution is the MOST appropriate for backing up a payload from a corporation with multiple servers and approximately 300 GB of data?()

A. multiple AIT (Advanced Intelligent Tape) drives configured for each server
B. a standalone LTO (Linear Tape-Open) drive configured for all servers
C. standalone DAT (Digital Audio Tape) drives configured for each server
D. a tape library unit with more then one DAT (Digital Audio Tape) drive configured for all servers
E. a tape library unit with more the one SDLT (SuperDLT) drive configured for all servers

10.单项选择题Which action increases server availability?()

A. configuring a second network card with a different IP address
B. replacing the existing 100 Mbps NIC with a gigabit Ethernet NIC
C. using adapter teaming and configuring the second network card with the same IP address as the first network card
D. installing a dual-port network card that can handle the future growth and setting one NIC to 10 Mbps and one NIC to 100 Mbps

最新试题

An Ultra 160 or Ultra 320 device falls under which SCSI standard?()

题型:单项选择题

Which backup solution is the MOST appropriate for backing up a payload from a corporation with multiple servers and approximately 300 GB of data?()

题型:单项选择题

Within Information Technology projects, communications between the project manager and the project team members should take place:()

题型:单项选择题

If the organizational spending plan has allocated $100,000 for a project, and the high level budget estimate for that project is $200,000; which of the following is accurate?()

题型:单项选择题

Which factor has the greatest impact on the estimated per unit labor cost for a project?()

题型:单项选择题

As a rule of thumb for QA (Quality Assurance) activities, how many hours of downstream QA (Quality Assurance) costs are saved for each hour spent on technical reviews early in the project?()

题型:单项选择题

What is a reason for reviewing the user requirements document with the client?()

题型:单项选择题

Acceptance of deliverables to multiple locations requires which type of sign off?()

题型:单项选择题

Which of the following SCSI signaling systems uses one return line for every outgoing line, is less susceptible to interference, signal degradation, crosstalk, and allows a cable length of up to 25 meters?()

题型:单项选择题

Team selection is not just a function of finding someone whos a technical or administrative expert. What will a project sponsor leading a high visibility project look for in a project manager?()

题型:单项选择题