单项选择题

A company plans to upgrade a network server. Before proceeding with the upgrade, the HCL (Hardware Compatibility List) and hardware is checked and necessary backups and documentation are made.  
The existing 512 MB of SDRAM is replaced with 1024 MB. The 10 Mbps network card is replaced with a 10/100 PCI network card. When the server restarts, beeps sound and the server does not pass the POST.  Which of the following is the MOST likely cause of the problem?()

A. The memory is not seated correctly.
B. The network card is not configured correctly.
C. The server does not support 1024 MB of memory.
D. Master SDRAM ECC needs to be enabled in the CMOS.


您可能感兴趣的试卷

你可能感兴趣的试题

1.单项选择题Which of the following is the functional description of a server connected between two separate IP subnets?()

A. server as a bridge
B. server as a router
C. server as a switch
D. server as a data link

3.多项选择题Which three should be documented after upgrading a SCSI RAID controller?()

A. disk utilization
B. installation date
C. adapter baselines
D. location slot of the RAID controller
E. status of the adapter card installation
F. RAID controller information (warranty, specifications etc.)

最新试题

The project sponsor wants the project manager to develop and implement Quality Management techniques to ensure a smooth project transition to the deployment phase. What is an appropriate Quality Management technique to implement?()

题型:单项选择题

Why does a project manager need an executive sponsor?()

题型:单项选择题

A technician purchases a new 120 GB IDE hard disk to use in an old server as a swap drive. After adding the drive to the server, the technician discovers that the operating system does not detect the drive.  After rebooting the server, the technician notices the drive is missing from POST and comes to the conclusion that the BIOS needs to be updated. The technician downloads the latest version of the BIOS update from the manufacturer website.  Which action should the technician take next?()

题型:单项选择题

Within Information Technology projects, communications between the project manager and the project team members should take place:()

题型:单项选择题

A technician needs to install the first SCSI controller in an application server. The SCSI card is factory-configured with a SCSI ID of 1. Which SCSI ID should the technician configure the card before installation?()

题型:单项选择题

A large corporation is concerned about the amount of time it takes to back up their main file server. They are also concerned that their IT technician frequently forgets to change the backup tapes, thereby leaving the company open to data loss. Which backup system would solve both problems?()

题型:单项选择题

Which backup solution is the MOST appropriate for backing up a payload from a corporation with multiple servers and approximately 300 GB of data?()

题型:单项选择题

Team member listing, scheduled tasks, and risk identification are part of the:()

题型:单项选择题

Which type of server is responsible for resolving NetBIOS names?()

题型:单项选择题

Which is the MOST effective method for generating support for your project plan?()

题型:单项选择题