A. disk utilization
B. installation date
C. adapter baselines
D. location slot of the RAID controller
E. status of the adapter card installation
F. RAID controller information (warranty, specifications etc.)
您可能感兴趣的试卷
你可能感兴趣的试题
A company plans to upgrade a network server. Before proceeding with the upgrade, the HCL (Hardware Compatibility List) and hardware is checked and necessary backups and documentation are made.
The existing 512 MB of SDRAM is replaced with 1024 MB. The 10 Mbps network card is replaced with a 10/100 PCI network card. When the server restarts, beeps sound and the server does not pass the POST. Which of the following is the MOST likely cause of the problem?()
A. The memory is not seated correctly.
B. The network card is not configured correctly.
C. The server does not support 1024 MB of memory.
D. Master SDRAM ECC needs to be enabled in the CMOS.
A.Developing key personnel
B.Leading technical specialists
C.Interfacing with customers / sponsors
D.Analyzing skills
A.Probability-Impact matrix
B.Pareto chart
C.R-Chart
D.PERT (Program Evaluation and Review Technique) analysis
A.WBS (Work Breakdown Structure).
B.cost benefit analysis.
C.requirements specifications.
D.narrative description of the work to be accomplished.
A.To gain the client’s acceptance of the detailed design
B.To verify mutual understanding of project resources
C.To verify mutual understanding of the detailed project plan
D.To verify mutual understanding of targeted product performance
E.To verify mutual understanding of the tests that will be done after the product is completed
A. 132 Mbps
B. 256 Mbps
C. 264 Mbps
D. 450 Mbps
A. configuring a second network card with a different IP address
B. replacing the existing 100 Mbps NIC with a gigabit Ethernet NIC
C. using adapter teaming and configuring the second network card with the same IP address as the first network card
D. installing a dual-port network card that can handle the future growth and setting one NIC to 10 Mbps and one NIC to 100 Mbps
A. There are discolored ceiling tiles near the middle of the room.
B. Large amounts of dust have accumulated in the corners of the room.
C. The anti-static carpet has been removed resulting in a bare painted concrete floor.
D. A wet pipe water-based sprinkler system has been installed above the racks.
A. MIB (Management Information Base)
B. OID (ObjectIDentifier)
C. register
D. community name
A.Design Acceptance
B.Code Acceptance
C.Module Acceptance
D.Site Acceptance
最新试题
The project sponsor wants the project manager to develop and implement Quality Management techniques to ensure a smooth project transition to the deployment phase. What is an appropriate Quality Management technique to implement?()
Two new servers are purchased and need to be installed to allow sharing of a single external hard drive enclosure. One server is configured as a local file server, and the other as a database server for a different network. The onsite technician notices that when both servers are running at the same time, they each receive SCSI errors. When they are running individually, no errors are reported. Which of the following is the BEST source of information to use for troubleshooting this problem?()
Why does a project manager need an executive sponsor?()
Which throughput does a 33 MHz, 33-bit bus have?()
Why is it important to have a final meeting on a project that has been cancelled?()
A large corporation is concerned about the amount of time it takes to back up their main file server. They are also concerned that their IT technician frequently forgets to change the backup tapes, thereby leaving the company open to data loss. Which backup system would solve both problems?()
As a rule of thumb for QA (Quality Assurance) activities, how many hours of downstream QA (Quality Assurance) costs are saved for each hour spent on technical reviews early in the project?()
What is the MOST accurate way to determine a project’s duration before execution?()
If the organizational spending plan has allocated $100,000 for a project, and the high level budget estimate for that project is $200,000; which of the following is accurate?()
After upgrading a server motherboard to the latest firmware revision, configuring LAN access in the SSU (System Setup Utility) fails. Which action should be taken FIRST to correct this problem?()