多项选择题Which three should be documented after upgrading a SCSI RAID controller?()

A. disk utilization
B. installation date
C. adapter baselines
D. location slot of the RAID controller
E. status of the adapter card installation
F. RAID controller information (warranty, specifications etc.)


您可能感兴趣的试卷

你可能感兴趣的试题

3.单项选择题Which of the following techniques is used for tracking the project risks?()

A.Probability-Impact matrix
B.Pareto chart
C.R-Chart
D.PERT (Program Evaluation and Review Technique) analysis

4.单项选择题The SOW (Statement of Work) is another name for the:()

A.WBS (Work Breakdown Structure).
B.cost benefit analysis.
C.requirements specifications.
D.narrative description of the work to be accomplished.

5.单项选择题What is a reason for reviewing the user requirements document with the client?()

A.To gain the client’s acceptance of the detailed design
B.To verify mutual understanding of project resources
C.To verify mutual understanding of the detailed project plan
D.To verify mutual understanding of targeted product performance
E.To verify mutual understanding of the tests that will be done after the product is completed

6.单项选择题Which throughput does a 33 MHz, 33-bit bus have?()

A. 132 Mbps
B. 256 Mbps
C. 264 Mbps
D. 450 Mbps

7.单项选择题Which action increases server availability?()

A. configuring a second network card with a different IP address
B. replacing the existing 100 Mbps NIC with a gigabit Ethernet NIC
C. using adapter teaming and configuring the second network card with the same IP address as the first network card
D. installing a dual-port network card that can handle the future growth and setting one NIC to 10 Mbps and one NIC to 100 Mbps

8.单项选择题The current data center has run out of space. A room that is located next to the existing data center is then used to house two racks containing six servers. Six months later, physical housekeeping is performed as part of a mid-year maintenance plan. Which environmental condition discovered in the room is LEAST critical?()

A. There are discolored ceiling tiles near the middle of the room.
B. Large amounts of dust have accumulated in the corners of the room.
C. The anti-static carpet has been removed resulting in a bare painted concrete floor.
D. A wet pipe water-based sprinkler system has been installed above the racks.

10.单项选择题Acceptance of deliverables to multiple locations requires which type of sign off?()

A.Design Acceptance
B.Code Acceptance
C.Module Acceptance
D.Site Acceptance

最新试题

The project sponsor wants the project manager to develop and implement Quality Management techniques to ensure a smooth project transition to the deployment phase. What is an appropriate Quality Management technique to implement?()

题型:单项选择题

Two new servers are purchased and need to be installed to allow sharing of a single external hard drive enclosure. One server is configured as a local file server, and the other as a database server for a different network.  The onsite technician notices that when both servers are running at the same time, they each receive SCSI errors. When they are running individually, no errors are reported.  Which of the following is the BEST source of information to use for troubleshooting this problem?()

题型:单项选择题

Why does a project manager need an executive sponsor?()

题型:单项选择题

Which throughput does a 33 MHz, 33-bit bus have?()

题型:单项选择题

Why is it important to have a final meeting on a project that has been cancelled?()

题型:单项选择题

A large corporation is concerned about the amount of time it takes to back up their main file server. They are also concerned that their IT technician frequently forgets to change the backup tapes, thereby leaving the company open to data loss. Which backup system would solve both problems?()

题型:单项选择题

As a rule of thumb for QA (Quality Assurance) activities, how many hours of downstream QA (Quality Assurance) costs are saved for each hour spent on technical reviews early in the project?()

题型:单项选择题

What is the MOST accurate way to determine a project’s duration before execution?()

题型:单项选择题

If the organizational spending plan has allocated $100,000 for a project, and the high level budget estimate for that project is $200,000; which of the following is accurate?()

题型:单项选择题

After upgrading a server motherboard to the latest firmware revision, configuring LAN access in the SSU (System Setup Utility) fails. Which action should be taken FIRST to correct this problem?()

题型:单项选择题