A.a part of
B.the whole
C.3/4th of
D.1/2nd of
您可能感兴趣的试卷
你可能感兴趣的试题
A.by the weight (tons) of cargo
B.by the capacity (tons) of vessel
C.by DW of the vessel
D.by the draft of the vessel
A.chartering
B.dispatching
C.fixing
D.tendering
A.on
B.to
C.at
D.in
A.provides
B.becomes
C.contains
D.comes
A.on
B.in
C.under
D.at
A.be carried out
B.encountered
C.be met with
D.be bringing
A.Charterers
B.Owners
C.both Charterers and Owners
D.neither Charterers nor Owners
A.whether
B.should
C.shall
D.if
A.Shipowner
B.Charterer
C.carrier
D.shipper
A.supplied
B.complied
C.provided
D.implied
最新试题
A vessel is not in every way fitted for cargo service()at the time of her delivery to the charterers her engine room staff is incompetent and inadequate,and accordingly she is unseaworthy.
An action for indemnity against a third person may()after the expiration of the year if brought within the time allowed by the law of the court seized of the case.
Where a propeller shaft passes through the hull,water is prevented from entering by means of a().
The carrier is entitled to()overboard goods which are dangerous.
Contracts whereby the possession and control of a ship vest()the Charterer are becoming more common today especially in the oil tanker trade.
The object of the both-to-blame collision clause is().
The merchant undertakes that no claim or allegation shall be made against any servant,agent or subcontractor of the carrier which()to impose upon any of them or any liability whatsoever in connection with the goods.
If the state of the goods at the time they were handed over to the consignee has been the subject of a joint survey or inspection by the parties,notice in writing()be given of loss or damage ascertained during such survey or inspection.
Where a charter-party stated that errors of navigation were excluded,it was held that these words referred to non-negligent errors,and()not wide enough to embrace negligent errors.
Delivery of a vessel to a charterer is called().