A.though
B.thought
C.throw
D.through
您可能感兴趣的试卷
你可能感兴趣的试题
A.pay
B.export
C.import
D.exercise
A.an indemnity
B.liability
C.responsibility
D.possibility
A.need
B.need not
C.will
D.to
A.be responsible
B.not be responsible
C.pay the Shipowner for the expenses incurred
D.not claim the Shipowner for the expenses incurred
A.in the loading place
B.in the port or dock
C.in the loading spot
D.in the discharging spot
A.he
B.she
C.the owner
D.the shipper
A.broken space
B.dead weight
C.constant
D.dead freight
A.a part of
B.the whole
C.3/4th of
D.1/2nd of
A.by the weight (tons) of cargo
B.by the capacity (tons) of vessel
C.by DW of the vessel
D.by the draft of the vessel
A.chartering
B.dispatching
C.fixing
D.tendering
最新试题
A breach of the()undertaking of seaworthiness at the port of loading entitles the Charterer to refuse to load.
If a full cargo is not loaded,the Charterer must pay not only freight on the goods actually shipped but also().
According to Gencon,if at any time during the currency of this Charter,both Owners and Charterers are unable to arrange bunkers at the main bunkering ports for the voyage in question,the()to have the privilege of canceling this Charter.
Apart from special contract or statute every Shipowner is()a liability akin to that of a common carrier,irrespective of whether the goods were shipped by a Charterer or on a general ship.
Delivery of a vessel to a charterer is called().
Freight rates are mostly charged().
Contracts whereby the possession and control of a ship vest()the Charterer are becoming more common today especially in the oil tanker trade.
Both the Shipowner and the Charterer will be discharged from their obligations under the charter-party if it()frustrated.
The object of the both-to-blame collision clause is().
If the Shipowner fails to give the Charterer the notice of readiness to load,and delay in commencing to load is thereby caused,the Charterer will (),as he is not bound to look out for the ship.