A.pay
B.export
C.import
D.exercise
您可能感兴趣的试卷
你可能感兴趣的试题
A.an indemnity
B.liability
C.responsibility
D.possibility
A.need
B.need not
C.will
D.to
A.be responsible
B.not be responsible
C.pay the Shipowner for the expenses incurred
D.not claim the Shipowner for the expenses incurred
A.in the loading place
B.in the port or dock
C.in the loading spot
D.in the discharging spot
A.he
B.she
C.the owner
D.the shipper
A.broken space
B.dead weight
C.constant
D.dead freight
A.a part of
B.the whole
C.3/4th of
D.1/2nd of
A.by the weight (tons) of cargo
B.by the capacity (tons) of vessel
C.by DW of the vessel
D.by the draft of the vessel
A.chartering
B.dispatching
C.fixing
D.tendering
A.on
B.to
C.at
D.in
最新试题
According to Gencon,if at any time during the currency of this Charter,both Owners and Charterers are unable to arrange bunkers at the main bunkering ports for the voyage in question,the()to have the privilege of canceling this Charter.
The merchant undertakes that no claim or allegation shall be made against any servant,agent or subcontractor of the carrier which()to impose upon any of them or any liability whatsoever in connection with the goods.
If a charter-party,although for two consecutive voyages,is held to be one indivisible contract,a deviation on the first voyage entitles the Charterer to treat the breach as a repudiation of()contract.
If a full cargo is not loaded,the Charterer must pay not only freight on the goods actually shipped but also().
If the Shipowner fails to give the Charterer the notice of readiness to load,and delay in commencing to load is thereby caused,the Charterer will (),as he is not bound to look out for the ship.
Apart from special contract or statute every Shipowner is()a liability akin to that of a common carrier,irrespective of whether the goods were shipped by a Charterer or on a general ship.
A breach of the()undertaking of seaworthiness at the port of loading entitles theCharterer to refuse to load.
If the place named for the loading is simply a port or dock,notice of readiness may be given as soon as the ship arrives()although she is not in the particular spot where the loading is to take place.
Delivery of a vessel to a charterer is called().
()the Charterer seeks to say that the contract has been frustrated or that there has been an anticipatory breach which entitles him to rescind,then he has such rights as are given him at common law.